Engineer with experience in piping & fabrication

Available
Serial No: 16351
Skills keywords: 
Current location:  Delhi, India - View on map
Nationality: INDIAN
Spoken languages: Arabic, english, gujarati, Hindi, Urdu

Qualifications

Mechanical Engineering(Diploma) completed in Feb–1992 from The M.S. University of Baroda-Gujarat-India.

SSC from Gujarat Secondary Education Board, Gujarat with 73.80 %

Career Summary

1. Heubach Colour Pvt Ltd., (India) From 16/05/2013.
Construction manager-Project for its expansion project in India.

2. Styrolution ABS (I) Ltd., (India) From 15/05/2012 to 01/05/2013
Construction manager-Project for its expansion project in India.

3. Randhawa Construction Company (India) From May 2011 to Jan-2012.
Planning manager for its project of Opal-Dahej. (ONGC Petro Addition Ltd)

4. National Petroleum Construction Company (NPCC), Abu Dhabi (UAE) From 26/06/2011.
Mechanical Engineer for NPCC (SEP-450, SELF ELIVATED PLANT).

Responsibilities undertaken are:

 Construction of self elevated plant (SEP-450) especially for Barge construction.

 Handling Construction, Sub Contractors, Monitoring of construction progress, Site activities and QC, Mechanical work, Erection of equipment, alignment, piping, fabrication of piping, Welding, Material handling.

 Preparation of commissioning methods, Plant Moving Vehicle (PMV), Construction work of sub contracts, Cost Control, Scaffolding.

 Review/Approve detail schedules prepared by the subcontractors and reviewed by the Area Superintendents / Supervisors.

 Ability to prepare, Co-ordinate and supervise project cost and scheduling. Co-ordinate with project team and work on risk and opportunity management analysis with a well balance attitude towards teamwork. Co-ordination and interface management with the disciplines and sub contractors.

 Scope finalization for all the activities (Equipment erection, Fabrication, Piping) involved in the project.

 Analysis of Estimated Vs Actual progress of project at different stages.

 Take a role of Site Constructability Co-ordinator in accordance with Site Office Constructability Implementation Procedure.

 Prepare final construction reports prior to closure of field office.

 Generate task driven schedule incorporating foundations, Fabrication, Equipment erection and alignment, Utility Piping, Pre-Commissioning and commissioning activities.

 Assist/support SHES Manager to prepare the site security plan in coordination with the Site Business Manager.

 Co-ordination with Quality Management Department.

 Implement safety program and ensure safe working conditions. Ensure a clean work site by supervising a site clean-up as required. Request all personnel on site to participate.

 Knowledge of various Welding Processes like SMAW, GTAW, SAW etc.

 Prepare detailed construction completion plan. Request subcontractor to submit list of remaining work and ensure completeness. Assist with preparation of required documents for construction completion.

5. Cairn Energy India ltd.(CEIL) From 16 Dec 2009 to April-2011
Construction Superintendent- Piping for its site of Barmer- Rajasthan (Mangala Processing Terminal-MPT). Oil and gas sector (Site of ONGC-Oil and natural gas corporation-India)

6. UHDE India ltd. From 14/07/ 2009. To Novemebr-2009
Served as a Construction Manager at the site of IOCL (INDIAN OIL CORPORATION LIMITED-REFINERY)-GUJARAT-VADODARA for its project.

Mechanical Scope

 Fabrication & Erection of Piping.(60 – 510 MT

 Fabrication & Erection of Structure. – 1900 MT

 Erection of Equipments. – 2976 MT

Looking after all type of mechanical work viz. structural,piping, equipment erection, painting, QA/QC etc.,

7. Descon Engineering, ABU DHABI, U.A.E. Oct 2008
Served as a Sr. Piping Engineer. Short term project.

8. Reliance Engineering Associates Ltd. (Refinery Complex, Jamnagar) From 11th June‘07 to 09thOct‘08
Served as a Sr. Piping Engineer in Construction of Utility and RTF department for JERP.
Responsible for Materials take off to finished product within scheduled time.

9. Corrtech International (P) Ltd. from 5th May 2007 to 9th June 2007.
Served as a Sr. Piping Engineer in Cross Country Pipeline for the gas line project in Gujarat with Gujarat Gas Company Ltd. (GGCL)

Mechanical Scope

 Under Ground Gas Pipeline. – 17129 MT

10. Narender Engineering Works. From 8thMarch ‘04 to 30th April ‘07
Served as a Sr. Piping Engineer in Construction field of Indian Oil Company Ltd. (IOCL)-Vadodara

Mechanical Scope

 Fabrication & Erection of Pipe.(60 – 510 MT

 Fabrication & Erection of Structure. – 1900 MT

 Erection of Equipments. – 2976 MT

 Piping Job. – 60000 ID Fabrication & 80000 IM Erections.

 Refurbishment of Equipments. – 1850 MT

11. Chem Contract (P) Ltd. From 5thAugust‘98 to 07thMarch‘04
Designation : PIPING ENGINEER.
Duration : 5th August 1998 to 7th March 2004
Client : Kribhco, Reliance at Hazira, Surat and Reliance Jamnagar.

Responsible for Materials Take off to Finished Product within Scheduled Time.

 Co-ordination Project Team for Fabrication activities.

 Fabrication of “Steel Structure” for different plants.

 Fabrication of “Piping and Piping Supports.”

 Pre-shutdown Fabrication for Major shutdown VMP. (Value Maximization Project)

 Worked for infrastructure development of Jamnagar Export Refinery Project (JERP) located at

Jamnagar.

12. Jyobina Engineering Works, from 5th February ’92 to 31st July ‘98
Designation : JUNIOR ENGINEER.
Duration : February 1992 to July 1998
Client : Gujarat State Fertilizer Company, Vadodara.

 Fabrication of “Steel Structural” for Caprolactum plant.

 Co-ordination with GSFC Project Team for Fabrication activities.

 Fabrication of “Piping and Piping Supports.”

 Fabrication and Erection of Underground piping at GSFC, pipes up to 20” to 72”.

 Fabrication of “Chimney, Tank and related Structure” for Galvanizing Line.

 Fabrication of “Pipe Spools.”

 “Fabrication and erection of Pipe Spools and Supports” during the shutdown job in Caprolactum Complex.

 Co-ordination with GSFC Project Team for Pre-Shutdown Fabrication & Erection Activities.

 Responsible for all Safety requirements during the shutdown as stated in the work-permit.

 Preparation of proper Scaffolding as per job requirement and get them inspected by GSFC project team.

 Co-ordination and interface management with the disciplines and Sub contractors.

 Well attitude towards team work.

 Issue the work permits to the various contractors by doing Inspection of Location of the Work Place for work to be done in the safest way by taking care of safety of the Personal, Machineries, Equipments and related to plant itself. Looking after all execution works like assembly, Inspection, Erection, Alignment, Painting, Fire-Proofing Works.

 






popup-img