EDUCATION AND CERTIFICATION.
1. GRADUATE ENGINEER B.E (MECHANICAL)
N.E.D UNIVERSITY OF ENGINEERING & TECHNOLOGY KARACHI PAKISTAN.
2. DIPLOMA H.S.E (ENGINEERING)
GOVT OF PAKISTAN
3. SAP TRAINED.
4. AFFILIATE MEMBER (IOSH) UK
5. LIFE MEMBER PAKISTAN ENGINEERING COUNCIL
6. EMERGENCY EVACUATION TRAINING FROM ( PIA)
EXPERIENCE
OPERATION MANAGER (BURSHANE PETROLEUM )
• Strategic planning & Setting target for under control departments.
• Supervision of middle level management to achieve targets.
• Personal involved to achieving target, making BOQ for project rehabilitation.
• Liaise with other clients & conduct important meeting with them.
• Conduct to making of budget & make recommendation for cost reduction.
• Preparation of report for senior management.
PLANT MANAGER (DARIAN OIL TERMINAL)
• Working as plant manager at Darian international (pvt) ltd oil terminal Karachi.
• Look after expansion & refurbishment of terminal tanks to convert into petroleum product tanks.
• Making BOQ, dealing with consultant, contractors, vendors, labors.
• Look after plant technical, administrative, & all related maters.
• Look after operation of oil storage, oil transferring, and truck loading.
(I M TECH) 3rd PARTY OGRA INSPECTION.
• Worked as senior inspector 3rd party inspection OGRA.
• Risk base inspection carried out for pre insurance.
• Inspection done in PAKISTAN REFINERY LTD (PRL),
• Inspection had done at many CNG stations, as per API rules, NFPA & ASME codes.
KARACHI ELECTRIC SUPPLY COMPANY
MANAGER PROJECT (01/11/2010 TO 2013)
Look after projects running in K.E.S.C.
Check project progress & coordinate with contractor.
Look after & adopt safety procedure during project running.
Worked as site in charger at 132000kv cable net work laying Project.
Implement work as per company required schedule.
Manage required facilities & coordinate with city Government.
MANAGER OPERATION (MARCH 2004 TO 31/10/2010)
Worked as operation engineer at 6*210 Mw Bin Qasim thermal power plant Karachi.
Supervises and directs personnel in the operation section of the power plant, for establishment of operation standard.
Responsible for the efficient and reliable operation of the plant, at their optimum values.
Coordinate with load dispatch department in load management.
Coordinate with maintenance staff and consulting engineers in the development of plans and schedules for preventive maintenance of plant.
Responsible for the collection of statistical data and preparation of power plant operating records. Performs other related duties as assigned.
Monitor & analyze regularly technical and economical process parameters.
Prepare technical and performance data analysis achieved after overhaul or modernization.
Assist in organizing special tests required to monitor the efficiency of the Units and suggest measures to improve efficiency of plant and equipment.
Ensured the safe, economical, and environmentally sound operation of plant.
Instruction and training of personnel to maintain safety standards.
MANAGER SAFETY & SERVICES (2000 to 2004)
Implemented a safety program to prevent or correct unsafe environmental working conditions, utilizing knowledge of industrial processes
Investigated industrial accidents to minimize recurrence and prepares accident report.
HVAC operation at large thermal power plant & their offices.
Toured plant to inspect fire and safety equipment, machinery, and facilities to identify and correct potential hazards and ensure compliance with safety regulations.
• Six train of 1000 ton each water treatment plant operation & its maintenance. Maintain its reliability & its performance at optimum level.
• Worked as HFO tank yard in charge.
• All other utility supply for thermal power plant.
ASSISTANT MANAGER OPERATION (1992 TO 2000)
Look after Thermal Power Plant & its Utilities. Internal & external boiler, water treatment plant, heat recovery system, and Waste water treatment plant, wide range of auxiliaries like hydrogen system, compressors, and HFO/LDO fuel handling station.
Look after fuel management during De-canting.
Assist manager operation in safe & efficient operation during shift.
Assist operation manager in plant start up / shut down operation
TEXTILE MACHINERY COMPANY (1990 TO 1992)
• Worked as manager Production Control & Quality Control Department
• Look after production with cost reduction & keeping quality.
• Look after machine shop, assembly line, paint shop & electroplating shop, heat treatment.
• Look after quality control section.
AL – ASAD ENGINEERING COMPANY (1988 to1990)
• Worked as Safety Engineer