Qualifications & Training
Bachelor of Science in Electrical Engineering
Certificate in Electrical Installation Practice
Permit to work (PTW), Site supervisory, Site management control, Contract dynamic management
Basic Offshore Safety Induction and Emergency Training inclusive of Travel Safely by Boat (OPITO Approved) Offshore Safety Update, Sea survival, Helicopter underwater escape training (HUET), Basic Fire fighting, Smokehood / Escape Set BA, H2s escape and awareness
Summary
Extensive 23 years international experience since 1989 in Commissioning, Construction, mechanical completion works in Oil & Gas installation, Drilling Rig, FPSO conversant, FPSO upgrading, Onshore Fabrication yard, onshore & offshore installation in LNG, onshore receiver, slugcather, condensate separation, Crude oil terminal & stabilisation plant.
Project Control and Planning, Project Management, Project Administration and related disciplines.
Particular experience in the development and implementation of engineering management systems, internal Equipment and material management control procedures, project management procedures, Project Completion and Commissioning.
Experience in management of Contractor, Subcontractor, Vendor, supplier and design contractor
Specialties Summary:
Electrical power and controls systems for LNG, Oil and Gas terminal, Onshore receiver, Stablisation and Condensate Plant, Offshore installation, Drilling Rig, FPSO, marine systems, LV/MV/HV Equipments and Instruments Commissioning, Fire & Gas mechanical completion and commissioning
1. Write up Electrical Procedure
• Installation
• Check sheets
• Pre commissioning
• Commissioning
2. Write up Instrument Procedure
• Installation
• Check sheets
• Calibration
• Leak testing
• Tubing Flushing and cleaning
• Pre-commissioning
• Commissioning
(a) Develop detailed plans for Instrument system commissioning activities. Clearly define the work scope and responsibilities
3. Write up Fire & Gas Procedure
• Installation
• Check sheets
• Pre commissoning
• Commissioning
4. Engineering
• Review Drawings, comments and acceptance
• Review and finalize detailed I&C systems commissioning procedures.
• Review and finalize system and sub-system level definition for I&C systems.
• Provide input to the Level 4 schedule. Monitor progress of electrical system construction and commissionin
• Materials take off
5. Execution of Construction works
• Manpower Planning
• Supervision and direct construction works
• Participate in system walkthroughs and verify instrument installation and reinstatement. Develop punch list items. Manage the resolution of punch lists raised.
• Plan and supervise mechanical completion check and red marked accordingly
• Review redlined drawings. Enforce MOC procedures.
6. Execution of Commissioning
• Write up system and sub-system Boundry
• Commissioning check, tunning, line-up ready for energisation including safety precaution
• Commissioning & Energisation
(a) Instrument commisioning
1. manage pre-commissioning and commissioning of hull and topsides
2. Witness and approve all instrument loop checks, C&E checks, SIS system checks, controller tuning, F&G system checks etc
3. Troubleshoot and resolve identified problems.
4. Provide work direction to the I&C commissioning team.
5. Alarm and shutdown setting adjustment; control system function testing; loop testing; hot oil flushing of tubing; preservation etc.
(b) 24VDC / 48VDC and Instrument power supply system
(c) Navigation and marine system
(d) Fire and gas system
(e) UPS power system
(f) Small and Lighting Power system
(g) Emergency Power system
1. 24VDC / 48VDC
2. 120/240VAC
(h) Main Power system
1. Low Voltage
2. Medium Voltage
3. High Voltage
(i) Power Generation system
1. Diesel Power generation
2. Turbine Power generation
• Red marked
• Hand over system to Operation
Work Experience
April, 2014 –Todate
E&I Lead Commissioning Engineer : AMEC, Baku, Azerbaijan
• Project: DWG-QUQ Platform Produce Water Treatment & Sand Separation
• Project: WA-PDQ Platform Produce Water Treatment & Sand Separation
Responsible for:
• Write-up Commissioning Procedure for Electrical & Instrumentation
02 July, 2013 –, 31 January 2014
Electrical, HVA, Instrument &Control Commissioning Engineer : Flour Arabia Limited
Project :Rolling Mills MA’ADEN, RAS AL-KHAIR, SAUDI ARABIA
March, 2012 – May, 2013 (Onshore & offshore)
Lead Electrical Commissioning Engineer : Petrofac Limited, (consultant from MCCS International)
Project : Cendor Phase 2 (CWD-B & CWD-C Wellhead platform)
: West Desaru (MOPU) Moveable offshore Production Unit
Responsible for
• Write up Electrical Check Sheets
• Write up commissioning procedure and execute Electrical Commissioning works and start-up of Eletrical system
1. Power Generation System
2. Power Distribution System
3. Lighting & small Power System
4. UPS power supply System
5. 24VDC power supply System
6. Marine and Navigation System
7. Earthing and bonding system
February, 2010 – February, 2012 (Offshore based)
E&I Work Preparator : Spie Oil & Gas, Luanda, Angola – consultant from AirEnergi Ltd UK
Project : FPSO Kizomba A Satellities
Responsible for the overall site engineering, planning, supervision of construction and commissioning, of Kizomba A FPSO satellities project in Angola offshore, for the field execution as per planned work programme.
Scope of project: Subsea riser Tie-ins, Water Injection skid, subsea well receiver, chemical injection skid, gaslift skid
December, 2009 –January, 2010 (Offshore based)
Electrical & Instrument Engineer : Sapura Kencana Petroleum
Project : Shell – St. Joseph field and south Furious field offshore platform upgrading, Hook up and commissioning
Responsible for the execution of a brown field development, including a field integrity upgrade and field capacity extension on existing oil facilities
June, 2009 to November, 2009
Lead Commissioning Engineer : (E& I) Sapura Kencana Petroleum
Project : KM 1 Drilling Tender Barge Rig
Responsible for the execution of E&I commissioning and start-up works and write up commissioning procedure
March, 2009 to May, 2009
E& I Commissioning Engineer :Edaran Cerah
Project :Petronas – MLNG 11 Rejuvenation (Slugcather)
This is the MLNG 2 Trunkline 3 & 4 Gas inlet onshore receiver Slugcather rejuvenation project. Write up procedure and commissioning of Gas inlet receiver facilities.
July, 2007 to Feb, 2009
E & I Engineer :FPSOcean AS, Norway
Project :Deep Producer 1 Conversion (FPSO)
This is the oil tanker conversant project to FPSO- Deep Producer complete with Dynamic Positioning system, Production process module, knock out drum & Vent stack, 35MW Gas Turbine Generator, Export facilities and Disconnectable Riser Buoy.
Responsible for
• Responsibe for DnV class acceptance &compliance for E & I
• Review E & I engineering design, give input, acceptance and compile
• Write up technical compliance requirement for E & I Installation contractor and supervise construction activities
• Write up mechanical completion plan and procedure
• Execute Commissioning works mechanical completion activities
January, 2007 to July, 2007
E&I Engineer : Setia Evolusi
Client : Nippon Steel, Batam
Responsible for write-up procedure (Installation, Calibration, testing, pre-commissioning) Write –Up materia take off,
Raise equipment & tools requirement list, supervise onshore pre-commissioning works
January, 2006 to December, 2006 (Partially offshore)
E & I Engineer : PT Sarku Engineering Utama, Indonesia
Project(i) :Connoco – HangTuah Metering Modifications Project (Indonesia)
Project (ii) : Kakap(KRA) subsea top side tie-ins (Indonesia)
These are the EPCC contract project.
During engineering phase onshore based
During installation & commissioning offshore based
Responsible for
• Client and design subcontractor, vendor and supplier interface
• Engineering activities
• Write technical requirement for procuments and review bid from vendor prior for submission for client acceptance
• Write technical requirement for design subcontractor, vendor review drawings for submission to client for acceptance
• Write up mechanical completion and commissioning procedure and for client acceptance
• Supervise installation works, mechanical complete and commissioning
January, 2005 to December,2005
Instrument Engineer :Majorhub Resources
Project :Petronas – Installation of Automatic Moisture Eliminator
Cordinate, workscoping, identify tie-in point, write-up material take off, attend weekly project progress
meeting with the client representative, attend the monthly project management meeting, generating work pack, develop Job hazard analysis, write-up procedure,(Installation, testing, pre-commissioning, commissioning) Write-up check sheets, supervise installation works. Pre-commissioning, commissioning and tie-ins works, red marked up as built drawings and production of hand over documentation and project close up documention
October, 2004 to December, 2004
Project Engineer : Petra resources
Project : Shell – Bintulu Stabilization Plant and Bintulu Crude Oil Terminal Rejuvenation
Lead the engineers project team and construction team, planning, generating work pack, develop Job hazard analysis, Material evaluation for Reboiler change out, Fire and gas system change out, Condensate system change out and Electrical control panel change out.
Coordinate, works direction, attend the weekly project progress meeting with client representative, attend the monthly project management team meeting, attend specific meeting with vendor & client representative, write-up procedure (Equipment / valve inspection, valve stroking, Installation, Calibration, testing, pre-commissioning) Write-up (Material inspection, Installation, calibration and pre-commissioning checksheets). Raise Material procument requisition, Raise Equipment & Tools procument requisition, red mark-up as built drawings, write project close-up documentation
September, 2004
Instrument Engineer : Sarku Engineering Services Sdn bhd, Malaysia
Project : Shell – E11 rejuvenation project (Onshore support)
Write-up material take off
June, 2004 to August, 2004 (Offshore based)
Instrument Engineer : Sarku Engineering Services Sdn bhd, Malaysia
Project : Nippon Oil Punchlist clearing – mastering listing
Responsible for engineering and execution, mechanical completion
March, 2004 to June, 2004 (Offshore based)
E & I Engineer : PT Sarku Engineering Utama, Indonesia
Project :Connoco – BBSD (Block B Subsea Development) Belida & Hang Tuah Platform
Coordinate, works direction, attend the weekly project progress meeting with client representative, attend the monthly project management team meeting, attend specific meeting with vendor & client representative, write-up procedure (Equipment / valve inspection, valve stroking, Installation, Calibration, testing, pre-commissioning) Write-up procedure for (Material inspection, Installation, calibration and pre-commissioning). Write-up cheecksheets. Raise Material procuments requisition, Raise Equipment & Tools procuments requisition, supervise construction works for the installation of platform umbilical terminal unit, subsea wellhead control panel, chemical injection pump, hydraulic power unit, slugcather, gas filter, flow analyzer, control valves, shutdown valves, flow transmitter, pressure transmitter, pre-commissioning, tie-ins works, red mark-up as built drawings, hand over project close-up documentation
July, 2000 to February, 2004
Project Engineer / Branch Executive : Saytech Sarawak
Project : MLNG – Term contract for Metering calibration and revalidation
Coordinate, works direction, workscoping, attend the project progress meeting with client representative, attend the monthly project management team meeting, Liase with government body representative for acceptance. Write-up procedure for calibration &testing. Raise Material procument requisition, Raise Equipment&Tools procument requisition, write revalidation close up documentation
July, 1999 to May, 2000
Instrument Engineer : Sarawak Shell Berhad, Bintulu, Malaysia
Project : Fire and gas upgrading (BCOT / BAGSF / BSTAB ½ / RT)
Coordinate, works direction, write up work pack, write up Job hazard analysis, attend the weekly project progress meeting with client representative, attend the monthly project management team meeting, attend specific meeting with vendor & client representative, Write-up procedure on live F&G Triplex panel changeover. Smoke, gas & flame detector (Installation, testing, pre-commissioning, commissioning, Tie-in to live loop). Raise Material procument requisition order, Raise Equipment & Tools procument requisition. supervise construction works. Red mark-up as builts drawings, write up project hand over and close up documentation
October, 1998 to May 1999
Instrument Engineer : Sarku Engineering Services Sdn bhd, Malaysia
Project : MLNG 2 Slugcatcher Damage Cables Replacement
Develop Job hazard analysis, develop work method of statements, Coordinate and supervise construction works, pre-commissioning, commissioning, live tie-ins of fire and gas detector, control valves, shut down valves, blow down valves flow transmitter, pressure transmitter, level transmitter, red marked up as built drawings and hand over documentation
April, 1998 to September1998 (Offshore based)
Instrument Commissioning Supervisor : Sarku Engineering Services Sdn bhd, Malaysia
Project : Shell – Kinabalu platform A (Remote operated platform)
Punchlist clearing and commissioning of Fire and gas system, emergency shutdown system, automatic shutdown system
July, 1997 to February 1998
E & I Engineer : Saratech Sdn Bhd Malaysia (Brooke Dockyard, Malaysia)
Project :Petronas – Malong platform fabrication
Supervise the construction works
January, 1995 to December, 1995
Instrument Superintendent : Tyco Engineering and construction International
Project : Malaysia LNG 2 Bintulu terminal onshore trunkline 3&4 receiving facilities
Coordinate construction works, write-up work method of statements, write-up material take off, Raise material requisition order, Raise technical query, supervise construction works, red marked up as built drawings and prepare hand over documentation to client
May, 1989 to December, 1994 (Offshore based)
E & I Supervisor : Shapadu Energy and Engineering sdn bhd, Malaysia
Project : Shell – Topside CAT III barge hook up programme