Professional Experience
BUREAU VERITAS, India (Oct’11 till Current Date)
Responsibilities Includes:
Evaluation & Verification of the following Process Activities :
BEP, Mass/Energy Balance, PFDs & P&IDs as per API RP 14C & 14J, NORSOK P-001
Process Equipment Design of
Three Phase Separator as per API RP 12J, PSV sizing as per API RP 520
Pressure Relieving system as per API RP 521, Shell & Tube Heat Exchanger as per API 660
Process Datasheet of the Equipments, Instrument & Valves
Line Sizing & Pressure Drop Calculation as per API RP 14E ,Equipment & Line List, Utility System
Safety & Loss Prevention Activities:
Escape Route and Safety Equipment Layout as per NORSOK S-001 & HSE Philosophy
Fire Protection and Fire Fighting Equipment Datasheets & Layout as per NFPA-10
Hazardous Equipment Schedule & Hazardous Area Classification as per IP-15 & API-505
Carbon Dioxide & Water Sprinkler Extinguishing system as per NFPA-12 & 13
• Review & Evaluation of Static & Rotating Equipment Design, Piping & Control Valves Specification.
• Certification of the Process & Safety Related Document of Onshore, Offshore Oil & Gas Project.
• Regular Co-ordination with Client for the status & update of the Design Appraisal Document.
Deputation Abroad :
• On Job Deputation to Abu Dhabi and Dubai for Design Review and Study of Fire and Process Safety Prevention Activities for Umm Shaif Super Complex and Das Island for Abu Dhabi Marine Operating Company (ADMA OPCA).
Major Projects Handled :
• Project : Natural Gas Storage Expansion
Consultant : Belleli Energy & Technodyne
International
End User : Dubai Natural Gas Company Ltd.
(DUGAS)
• Project : Hazardous Area Classification
Consultant : Aker Solutions
End User : Johnson Matthey
(Formerly – Akzo Nobel)
• Project : Fire Protection System
Consultant : Vimal Fire Control Pvt. Ltd.
End User : Hindustan Petroleum (HPCL)
• Project : Zawtika Project Phase 1A –
Offshore
Consultant : Larsen & Toubro
End User : PTT Exploration and Production
Public Company Ltd.
• Project : USSC/Das Island
Consultant : Technip, France
End User : ADMA OPCO (Subsidiary of
ADNOC)
• Project : Zakum Field Development
Consultant : Technip, France
End User : ZADCO (Subsidiary of ADNOC)
• Project : Umm Shaif Power Balance
Consultant : Mott MacDonald
End User : ADMA OPCO (Subsidiary of
ADNOC)
• Project : 200 Ton/hr. LPG Plant
Consultant : Projects & Development India Ltd.
End User : IOCL
• Project : South Par Gas Field Development
Phase 14 (Offshore)
Consultant : IOEC
End User : Pars Oil and Gas Company
• Project : Ashtart Revamping Project
Consultant : Production Services Network
End User : SEREPT Oil & Gas
ARMACO Process System Pvt. Ltd., India (Sept’09 till Sept’11)
Responsibilities Includes:
• Developed Project Scopes and Cost estimates according to Product capacity.
• Developed PFDs, P & IDs , Process and Mechanical design of Reactor, Shell & Tube H.E., Pumps,
Distillation Column, Cyclone Separator, Packed tower, Line Size calculation & Utility consumption.
• Preparation of Datasheets of Process Equipments, Equipment layout, Foundation layout, G.A.
• Preparing specifications for all required process equipment items, including Vessels and Internals,
Heat Exchangers, Distillation & Absorbing columns, P/T Gauges, Control valves & Utility system.
• Developed spreadsheet in excel for Vessel sizing, Insulation thickness, V-L Separator sizing.
• Performed technical approvals on equipment for contractors and/or clients.
Major Projects Handled :
• Project : 7500 TPA Fine Solvents &
Chemical Project
End User : RFCL (part of Avantor Materials)
• Project : 2000 TPA Alkyl Titanate
Project(Batch to Continuous)
End User : Polygel Ltd.
CHEMITHON Engg. Pvt. Ltd. , Mumbai (June’08 till July’09)
Responsibilities Includes:
• Developed PFDs, P & IDs, Process and Mechanical design of Process Equipments of Sulphonation,
Heat/Mass Balances, Line & Equipment Sizing, Bill of Material, Enquiry list.
• Datasheet of Liquid-SO2 Cyclone Separator, Plate Type Heat Exchanger, Reciprocating Pump .
• Regular Co-ordination with Vendor for quotation & technical/commercial clearance .
• Planning, Scheduling & Management of the Project. Inspection of Equipment & Erection of the plant.
Major Project Handled :
• Project : 2500 TPA Sulfonic Acid
End User : Nirma Ltd.
Education History
Hazard & Operability Study (HAZOP) Certification, DGFASLI .
Post Graduation Diploma in Process Engg. (Distinction), India.
B.E. (Chemical Engg.), University of Mumbai, 2008.
Key Skills
• Process Designing & Safety Engineering in the Hydrocarbon & Pharmaceutical Project .
• Chemcad, HTRI, Hysys, Microsoft Office & Visio, Autocad