Experienced Project Control Engineer

Available
Serial No: 6402
Skills keywords: 
Current location:  Tamil Nadu, India - View on map
Spoken languages: Arabic, Engilsh, Hindi, italian, KANNADA, Malayalam, russian, Tamil

Qualifications :

Diploma in Contract Management

Diploma in Project Management

Diploma in Civil Engineering

Civil Cad Draughts Man

Software Skills :

• Primavera – Version 6, 5 and 3

• M.S. Project Ver 2007, Auto Cad Ver 2006,

• MS Office 2007 (Word, Excel, Power Point)

• SAP – {Scheduling, rescheduling, PCNF, CNF, Accruals and Service entries etc., (in PDO-Petroleum Development of Oman)},

• Build Super Fast-(Tendering, Estimate & costing)

• Volcal – (Roads and canel Earth work Software)

Work Experience:

Experience : 22 Years (8 Yrs – in Oman, UAE, Kazakhstan, Yemen, Nigeria)

(18 Years- Project Control Dept, 2 Years- Project Engr, 2Yrs-Site

Engr)

Involving in EPC Project, EMC Projects, ESC Projects, Shut down Project and

Maintenance Project etc. In various sectors like Oil & Gas Upstream ON SHORE and

OFF SHORE projects, SHUTDOWN Project, Maintenance Project and Construction

Industries etc. Excellent in Planning, Cost controlling having experience in various

Departments like Project Control, Proposal & Tendering, Estimation, Commercial and

Engineering Department, etc.

For On shore Projects like: MP and LP Gas compressor plant, MP and LP Separators, Turbo Gas Generator Plant, Nitrogen Plant, Instrument Air system Plant, Fuel Gas Heater and compressor Plant, Chemical injection Plant, KO and AP Drum and Flare system, Sulphure, Cured oil Storage and Fire Fighting tanks work, Booster Station work, Substation work (MCC, HV, MV and LV Panel, Transformer Yard, 33KVA Tower line work), Control Building work (DCS, PAGA, F&G, Telecom), Cross country Pile line work, Well Head work, Manifold work, Treatment Plant, Closed Drain Pits etc.

For Off shore Project Like: Gas Compressor Plant, Nitrogen and Instrument Air system, Sulphure plat, Storage Tank, Jetty yards work and Control Building work etc.

For Shut down Projects like: Compressor, Separators, Turbo Generator, Process skid, Process Air cooler, Filter Coalescer. Lube Oil cooler, Fuel Gas system, Storage Tank, N2 and Air Compressor Plant etc.

For Maintenance Project like: Oil and Gas Pipeline Internal and External Integrity check, Cossco coupon check, Cathodic Projection check, Pipeline external repair work, Oil and Gas Pipe line internal Cleaning work (Pigging), etc.

Construction Industries: High raised building, Industrial building, Commercial complex, Office complex, Software complex, Forging units, Pharmaceutical factory, Sugar factory, Automobile industry, Smelter factory, Casting unit, and Computer Manufacture factory etc

Professional Skills :

• Hands on experience in Primavera Ver 6,5 & 3 and M.S projects

• Adequate knowledge in Oil & Gas Sectors and Construction of Buildings, good Supervisory skills

• Adequate knowledge in QA/QC activities, Quantity Surveying, Steel Structure Fabrication, Erection etc.,

• Knowledge in HSE activities at site

• Excellent in Planning, Cost Control, Quantity Surveying, Site execution etc.

• And I Can independently handle the Planning & reporting activities under the guidance of Project Control Manager or Planning Manager

• Adequate communication skills Good in monitoring and training to the junior Planning staffs and excellent team player

• Experienced in all phases of the project (Engineering, Procurement, Construction, Commissioning)

• Develops and maintains comprehensive integrated master project schedules including Front-end Loading, Detail Design, Procurement, Construction and Start-up/Commissioning Project Stages.

• Maintains schedule during the project life cycle monitoring progress and incorporating modifications where changes in the original scope occur or delays are encountered.

• Utilizes project cost estimates to resource load project schedules and gain alignment with estimated scope of work and the project schedule.

• Performs staffing density checks or staffing limitation checks to validate schedule durations.

• Performs critical path analysis to determine problem areas in regards to project schedule and resource overloads

• Alerting the project team to critical scheduling issues.

• Evaluates project deviations to assess schedule impact for proper decision making.

Works with cost management to gain alignment when forecasting schedule completion dates.

Competencies :

• Initiative

• Construction Planning & scheduling

• Quantity surveying

• Budget analysis

• Interpersonal Effectiveness

• Critical path project management

• Learning

• Project Cost controlling

• Teamwork

• Estimating

GULF & OTHER REGION EXPERIENCE DETAILS

A) Name of the Organization : M/s Nigerian Agip Oil Company Limited (NAOC),

Nigeria {Idu Phase 2 work completion and Flare down Project

(55 Millioin Euro)}

Duration : Sep 2011 to April 2013

Designation & Nature of work : Planning Engineer

• Checking and Approving the Micro level Schedule for all the ongoing works in EPC project ( MP & LP separator, Fuel Gas System, Turbo Generator, LP & MP Compressor, Substation and Control building, and interconnecting pipe work between systems etc.)

• Checking and Approving the Daily, Weekly and Monthly Report from the Contractor

• Conducting Weekly meeting with contractor Planning Personal for review the Planning activities

• Attending the Daily Tracker Meeting and Weekly Progress meeting with Project Team

• Checking and Approving the Two weeks Look ahead for weekly basis from the contractor

• Certifying the monthly PMS (invoice) from the Contractor

• Checking and approving for job cards for Engineering, Construction, Pre-commissioning and Commissioning Activities

• Preparing and submitting Weekly Photographic Report and Work details Report to the Higher Level Management

• Monitoring and Reporting to the Higher Level Management for the Critical Activities in the schedule

• Monitoring and reporting to Higher Level Management for Major field Activities Like Civil, Mech, Piping, E&I and Pre com and Com work

B) Name of the Organization : M/s Bonatti.S.p.A – Kazakhstan / M/s Tanmia Oil & Construction

Ltd –Yemen (U2 Material Replacement work at Karachaganak

Petroleum Operating (40 Million Euro) –Kazakhstan, (KHARRIR

CCU Extension Project at TOTAL (70 Million USD) – Yeman

Duration : Two and Half Years (Jan 2009 to July 2011)

Designation & Nature of work : Planning Engineer

• Preparing the Detail Pre-shutdown and shutdown Schedule with Primavera and Micro level with Excel sheet Including preparing the Progress sheet, S – curve and Man power Histogram for all the Pre- shutdown and shutdown activities

• Preparing the Costing report for Shutdown and Infield works with weekly and monthly basis

• Generating various reports like (5days or 7days look ahead, 6 Week look ahead and 3Month Look ahead etc.) with PRIMAVERA Ver 3 and 6) for flow line works and shutdown works

• Monitoring the schedules, for Sub Contractor’s activities in case of any shortage, report to Project Control Manager (or) Project Manager. To recover the time

• Checking the Recovery schedule for Sub Contractor

• Preparing the recovery schedules for Pre shutdown activities. And flow line work

• Attending weekly progress meeting and monthly meetings with client

• Preparing and Publishing the daily, weekly and monthly reports to Client

• Preparing and Publishing the Weekly report for all the infield work to Higher level Management

• Checking and implementing Cost code for all the activities

C) Name of the Organization : M/s Costain Abu Dhabi Company W.LL – Abu Dhabi

(EPC Contracts Replacement of Buried Pipe work in STOREX Area – for ADMA -172 Million AED)

Duration : 18 Months (June-2007to Nov 2008)

Designation & Nature of work : Planning Engineer

• Preparing the EPC contract Schedule level 4 including Creating/Assigning/Analyzing/Leveling the Resource & Costing, Creating WBS, Generating various reports like (Man power histogram, Recourse Histogram, 3moths look ahead and 6 months look ahead etc.) Saving /updating the Baseline program, Identifying the Risks/Issues/Thresholds in the schedule, Using the various keys like Group & Sort, Claim digger, Global Changing, and filtering the activities in various levels with PRIMAVERA Ver 6

• Preparing the Progress “S” Curve for Engineering, Procurement, construction, Activities

• Preparing the progress registers like (Engineering, Procurement and construction etc.)

• Review in detail the recovery schedules as submitted by the Sub Contractors and ensure manpower and site supervision staffs are increased properly.

• Assist Project Managers during preparation of Monthly Progress reports and Monthly Executive Presentations.

• Preparing and submitting the Project progress reports for Daily, weekly and Monthly to ADMA

• Attending Meeting with Project Manager for Weekly and Monthly

( Commercial Section – EPC Contracts Tender For ADMA, ADGAS & OXY etc,)

• Receiving, reviewing, preparing, and submission of Tender package, both Technical and Commercial submission for EPC Contracts

• Preparing the program From level 1 to level 3 for Tendering purpose with PIMAVERA Ver 6

• Preparing the Organization chart, Manpower Histograms and “S” Curve etc.

• Preparing the Risk registers, PMR (Project Management report) for Monitoring the Progress and controlling in Cost for on going projects.

• Preparing the Exception and Qualifications for Technical and Commercial submission in the tender

• Preparing the procurement schedule, BID management action list, construction method statement for Civil and Mechanical works etc.

• Preparing reports and getting approval from U.K Office for EPC Tender in IBP GATE 1 to GATE 5 {Gate 1 (Approval to Pursue Customer & Opportunity), Gate 2 (Approval to proceed for pre Qualification), Gate 3 (Approval to prepare tender), Gate 4 (Approval to submit Tender) and Gate 5 (Approval for Tender amendments etc.)}

• Working out the estimate Quantity for Planning & Costing purpose

• Attending pre bid meeting, post bid meeting and site visit with clients. (ADMA, ADGAS)

D) Name of the Organization : M/s Gulf Petrochemical Services & Trading LLC,

Sultanate of Oman.

Duration : 2 Years (2005 – 2007)

Designation & Nature of work : Planning Engineer

Planning Engineer – EPC Contracts (MMPS Extension work) and Pipe Line Corrosion

Management’s contracts works at PDO (Petroleum Development Oman LLC, Oman)

• Preparing the programs Level 1, to Level 5 for shutdown activity and regular Activities using Primavera Ver 3 or M.S Project. 2003

• Planning the Recourse like Man power, Equipments, and Material for on going EPC projects.

• Preparing the monthly “S” curve, and Bar Chart for on going projects,

• Monitoring the Day to Day progress & any in-trances comes giving good suggestion to the site manager to Without affecting the schedule

• Preparing F.C R (Field Change Report) & F.T R (Field Trouble Report ) reports

• Preparing Micro Level execution program for Daily, Weekly, Monthly, for all the Activities

• Preparing the report for routine & non routine activities for pipe line maintenance work for 30days, 90days, and 180 days & yearly for the on going project.

• Preparing the forecast budget for Monthly, quarterly & yearly for the on going project

• Attending the Client meeting and conducting sub contractor meetings for weekly and monthly basis.

• Preparing & submitting Progress report to client for Daily, Weekly, Monthly and Quarterly for all the activities,

• Updating 14day /90days Rolling plan in SAP to achieve the good KPI (Keep Performance Index) and entering the Accruals and service entries in the SAP for on going projects

INDIAN EXPERIENCE DETAILS

A ) Name of the Organization : M/s GANESAN BUILDERS LTD – Chennai – India.

Duration : 10 Years (1995 – 2005)

Designation & Nature of work : Project Engineer

As Project Engineer (2 Years)

• All the type of building work carried out like Production block, Sub station block, Canteen block, Rest room, plumbing and sanitary work, Road and Storm water drain work, landscaping work, Cable tray foundation, Cooling tower, treatment plant, portable water tank. Under ground sump, Over head tank, molasses tank foundation and Machinery foundation etc.

• Mobilization & demobilization of men, material, machinery for the above building work

• Getting the Government approvals work Like Labour ministry office, Commercial tax office etc. and getting the Insurance policy work like Car policy, Work man compensation policy etc.

• Preparing the Control estimate and Forecast budget for the projects

• Preparing the Project planning Schedule all the activities and Procurements schedule for bulk materials in on going projects

• Preparing the Design Mix for Concrete work and insisting the Quality and Safety of the on going projects

• Preparing the site execution drawings using with AUTO CAD,

• Clarifying the entire drought with client or Consultant, Co-ordinations & maintaining Good relationship with clients or consultants.

• Attending weekly, monthly meeting with clients or consultants and conducting daily progress meeting with staffs & sub contractors.

• Preparing punch list, additional Claims report, Escalation or variation reports, final Invoicing and Reconciliation reports for on going and completing project

• Getting the Completion Certificate & Security deposits from the Clients or Consultants

For the following Projects in India:

a. T.V.S Motor Company at Mysore.(10 Crore)

b. Shasun Chemical Ltd at Pondy (10 Crore)

As Sr. Commercial Planning Engineer (5 Years)

• Preparations of Pre-biding Activities like Organization Chart Equipments list, Material list, Man power list, Project Award list, Project completion and execution list, Company performance Chart, company financial strength Statement and chart etc.

• Preparing and submitting the Tender in Turnkey Projects with MNC companies (Schwing Stetter), Software companies (Wipro Computers, Tata Consultancy Service) Big Industrial & Residential Buildings companies (I.C.L Sugars, Maruthi Master Services) etc.,

• Bidding the Best price of the company considering, all the elements like Material, Laobur, Equipment, Logistic, Water& Power, Material & Equipments Hiring charges, escalation Charges, incidental expenses & over head and Profit etc., Using with Build Super Fast-(Tendering, Estimate& costing) software.

• Attending the Pre- Bid, Post bid & Negoasation meeting with Client & Consultant,

• E-Biding: with MNC Companies & preparation for Clarification report for Technical and commercial in the bidding

• Project supporting work: Preparation of Program for Macro and Micro level, Project Organization Chart, & Extra Rate Analysis for Tender and Non tender items, tender clarification. Reconciliation for Client Invoice vs. Sub contractor Invoice etc.

• Taking out the estimate Quantity for Planning, Costing and Material Requisitions purpose for the on going Projects,

For some of the Major projects.

a) Schwing Stetter India Ltd –Chennai.

b) Xansa India Ltd – Chennai

c) T.V.S Motor Company at Mysore.

d) Maruthi Master Services at Guindy.

e) Wipro Computers – Pondy.

f) Tata Consultancy Service – Chennai

g) I.C.L Sugars Ltd at Mysore

As Project Planning Engineer (3 Years).

• Preparation of Program for Macro and Micro level using with M.S Project, Extra Rate Analysis for Tender and Non tender items, BOQ clarification. Reconciliation for Client Invoice vs. Sub contractor/ supplier Invoice etc

• Monitoring the Day to Day progress & any in-trances comes giving good suggestion to the Project manager to without affecting the program

• Attending weekly and monthly meeting with clients or consultants and conducting daily progress meeting with Project manager, staffs & sub contractors

• Reporting to Head office and client for Daily, weekly and monthly progress

• Preparation of Client Invoice and checking the Sub Contractor/ supplier Bill etc.

• Reconciliation for Bulk materials like Cement, Steel, Metal and sand etc.

• Working out the estimate Quantity for Planning, Costing and Material Requisitions purpose for the on going Projects,

For some of the Major projects.

a. D.B.S Residential Flats at Adyar,

b. Fomas India Ltd – Padalam,

c. Tata Consultancy Service at Chennai

d. I.C.L Sugars Ltd at Mysore.

e. Wipro Computer at Pondy

f. Sanmar Group of Companys – Tirchy

B ) Name of the Organization : M/s LARSEN & TOUBRO LTD, (E.C.C. CONSTRUCTION

GROUP) – Chennai – India.

Duration : 2 Year (1993 – 1995)

Designation & Nature of work : Assistant Planning Engineer

• Preparation of Program and bar chart for on going project

• Preparation and submission of reports like From S1 to S10 (Client Invoice, Sub Contractor Invoice, Weekly and Monthly Progress report, Bar Chart, “S” Curve, Productivity Report, Bulk Material Reconciliation, Form work Reconciliation etc.) and Extra rate analysis for Non Tender Items.

• Preparation of job cost report including Zero cost estimate

• Taking out the Quantity estimate for Planning, Costing and Material Requisitions purpose for the on going Projects

• Entering cost code numbers for Indent, Sub contractor Invoice, labour payment etc.

For following projects.

a. Tek Tex Prossing Complex at Kerla

b. Ashok Leyland Factory at Hosur

c. Sterlite Industries at Tuticorin.

C) Name of the Organisation : M/s WAMEC ESTATES DEVELOPERS (P) LTD – Chennai – India.

Duration : One Year Two months. (1992 – 1993)

Designation & Nature of work : Site Supervisor.

As. Site Supervisor

• Supervising the Construction activities like Marking, Excavation, Blinding work, Reinforcement work, Form work, concreting work, Filling work, brick work, Plastering work, water proofing work, flooring work, Plumbing and Sanitary work, Tileing work, and painting work Interior Decorator work etc.

• Preparing Daily progress report and weekly sub-contractors billing etc.

For following projects

a) Office Complex at – Chennai

b) Residency complex at – Chennai.

D) Name of the Organization : M/s EAST COST CONSTRUCTION AND INDUSTRIES –

Chennai – India.

Duration : One Year (1991 – 1992)

Designation & Nature of work : Site Supervisor.

As Site Supervisor

• Supervising the construction activities like P.C.C work, Reinforcement work, Form work, Concreting work, Brick work and Plastering work etc.

• Preparing Daily progress report and weekly sub-contractors billing etc.

For following projects

a) Koyambedu veg Markets Project – Chennai.

b) North madras Power Plant – Chennai

E) Name of the Organization : M/s SREEPATHY AGENCIES, Chennai- India.

Duration : One Year (1990 – 1991)

Designation Nature of work : Draughtsman -Civil

• Preparation of CMDA/Municipality Approval Drawings for Residential building, Office building, Industrial building etc,

• Preparation of cost Estimates for Loan and Valuation report for banks etc.

• Preparation of Construction Drawings, as built drawings etc.

 






popup-img