Qualifications & Training
Diploma in Mechanical Engineering, India-1984.
ISO 9000 Quality Management System
ASME Section IX, Section II Part C Degree Mechanical Engineering course completed
IRCA Approved Lead Auditor Certificate
ASNT Lever II in RT, UT, MT & PT
Training : Welding for Supervisors from Welding Research Institute, B.H.E.L, Trichy
Industrial Safety, Health & Hygiene Course from Regional Lab our Institute, Madras
Career Summary
From 2014 May Onwards
Working as a QA/QC Manager in AE ARMA, BAKU, AZERBAIJAN
Jan2012 to April 2014
Worked with Shah Gas Development Project(Al Hosn gas)
underProject Management Consultant FLOUR as a Senior QA/QC Engineer
Under ADNOC/Abu Dhabi gas Development Company.
Projects of GAS Processing units,Sulphur recovery units bycontractorSaipemandPlant utilities/OffsitebycontractorSamsung.Shah sulphur station and pipe lines project Package 11 by CCC under CH2M HILL.
Working with TAKREERRUWAIS REFINERY Expansion Project (EPC-6) Non process buildings
Overall supervision of QA/QC of the project, Managing the 3rd party Inspectors of various disciplines such as civil, building,structural,piping, Electrical, Instrumentation, rotating, static, welding, coating, Insulation. Issuing NCR to contractors for nonconformity works, conversant with ISO 9001 Quality systems, Familiar with various codes & standards applicable to oil and gas Industry, Familiar with NDT techniques, welding procedure & welder qualifications. Familiar with fabrication processes and associated testing related to pressure vessels and Equipment inspection.
Jan 2010 to Jan 2012
Worked as Project QA/QC Engineer for ELSERVCO-ELMACS-GENCO Consortium (MEP Contracting Company)
Duties&Responsibilities:overall supervision of QA/QC of steel works,fabrication,weldingpainting, bolting,erection. MEP works-Electrical installation,Installation of HVACducts,fans,air handling unit,airinlets & outlets, chilled water pipes, pre commissioning checkups chilled water pumps, fan coil units,air handling unit installation, sprinklersystems, strand pipes, hose rack system, fire extinguishers, underground drainage piping, above ground piping system, sanitary fixtures, water distribution piping, water heaters, material inspection and approval
July 2006 to Nov 2009
DAR AL HANDASAH CONSULTANTS, DUBAIas QA/QC ENGINEER
EXHIBITION CITY project of DUBAI WORLD TRADE CENTRE, Jebel ali
New exhibition halls project, World Trade Centre, Dubai.
DUBAI DUTYFREE WARE HOUSE PROJECT OF DUBAI
DubaiINTERNATIONAL AIRPORT expansionTerminal3 & Concourse 2
Preparation ofinspection reports and documentation. Safety matters relating to the project, Internal auditing Quality, overall supervision of QA/QC of steel works, fabrication, welding, painting, bolting and erection. MEP works-Installation of HVAC ducts& accessories, fans, air handling unit, air inlets & outlets, chilled water pipes, chilled water pumps, fan coil units, pre commissioning checkups alignment, air handling unit s, sprinkler systems, strand pipes, hose rack system, fire extinguishers, underground drainage piping, above ground piping system, sanitary fixtures, water distribution piping, water heaters, material inspection and approval
Inspection of structural steel works-structural steel bolting, fabrication, erection, welding, N.D.T and Coating includes special coatings-intumescent coating, fire proof coating, sprayed fireproof coating etc.Inspection of cladding- Roof cladding & wall cladding etc, preparation of ITP, Preparation of Punch list
Inspection of MEP Works-firefighting, plumbing, drainage, HVAC etc
Sept 2004 to July 2006
Cleveland bridge engineering & Middle East Ltd, Dubai as QA/QC Engineer
DUBAL SILO 7 Construction project of Dia 45 meter and height 50.5
Dubai international airport project Concourse 2 & Terminal 3
DUBAL potline7, Main substation project
Fujairah power plant Desalination tank repair project
Dubai Festival city crescent mall project
Dubai international airport Terminal 1 Expansion Project
Monitoring materials inspection at receiving stage with appropriate mill certificates and heat numbers during construction, identify those that adverse to the contract plan and specification and report them to the Project Manager.
Monitor, inspect and record structural steel works, check and verify the line, level, plumb of shell erected, check erection tolerance, bolting up and all appropriate clauses of specification.
Inspection of joint fit up, dimensional inspection, Monitor parameters before starting welding, during welding and after welding, Weld visual inspection and Release for NDT inspection.
Monitor, inspect and record structural steel fabrication and installation, welding inspection as per BS 2654, AWS – Structural Welding Code, witnessing Nondestructive test for welds.
Monitor, inspect roof cladding, aluminum wall cladding, and metal decking, shear stud welding and bend test inspection, ensuring bolt tightness with troque wrench.
Regular visual inspection that bolts, nuts, washers need connection are the correct type and grade and installed properly
Coating inspection – Inspection of blasting profile, cleanliness as per specification, record and measure ambient conditions during painting application, Painting inspection for every intermediate coats both Wet film and Dry film thickness, Ensuring Paint finish quality as Coating inspection.
Preparing of non-conformance reports, deviation notice and review of corrective action proposals.
2000 Nov to 2004 September
L&T Ltd, Hazira, SURAT, INDIA- QA/QC Engineer
Offshore oil jacket platform project of ONGC
Offshore living quarters project,PS2Q-QATAR PETROLIUM
Monitor material inspection at receiving stage with appropriate mill certificates and heat numbers as per contract specification.
Job involves inspection of fabrication and erection of offshore jacket oil rig platform project of ONGC metal comprising of steel structures, monorail structures, stairs, and walkways, access platforms with open gratings, bird mesh side wall panels, caged access ladders, and handrails. Pre-assembly of fabricated items before delivery at site. Preparation of inspection reports, coating reports dimensional inspection and preparation of reports.
Coating inspection – blasting as per specification, record and measure application temperature before painting application, Painting inspection for every intermediate coats both Wet and Dry film thickness.
Monitor, inspect weld fit up, inspection before welding ,during welding, after welding, inspection of weld visual, monitoring welding activities as per quality requirements, generate NDT requests.
Preparing inspection reports, QA/QC document preparing as per ISO9001 procedure.
Maintain records, reports, test result, documentation and other essential information in accordance with project procedure.
1992 Nov to 1997 Nov
SCECO-east Gazlan power plant project, Dammam, K.S.A-Mechanical Specialist (QA/QC)
Responsible for implementation of quality control plans pertaining to welding,fabrication,coating,insulation,electrical,civil& instrumentation,coordination with client for all site Inspection and its documentation,monitoring various activities of subcontractors and follow up for implementation
Inspection of Integrity of plant, equipments and piping
Monitor material inspection at receiving stage with appropriate mill certificates and heat numbers as per contract specification.
Preassembly of fabricated items before delivery at site. Preparation of inspection reports, coating reports dimensional inspection and preparation of reports. Blasting as per specification, record and measure application temperature before painting application, Painting inspection for every intermediate coats both Wet and Dry film thickness. Monitor, inspect weld fit up, inspection before welding ,during welding, after welding, inspection of weld visual, monitoring welding activities as per quality requirements, generate NDT requests. Preparing inspection reports, QA/QC document preparing as per ISO9001 procedure.Maintain records, reports, test result, documentation and other essential information in accordance with project procedure.
Coordinating with third party inspectors, consultants, preparing inspection reports conforming work done as per contract specification and standards.
April 1999 to Novenber 2000
Technical inspection services Cochin, India – Crude oil Pipe line project, Cochin Refinery Ltd., India. Q/C Engineer
Inspection of 48” Crude oil pipe line project. Pipe line installation, testing and commissioning of the pipe line system.Integrity of plant, Piping and Equipments.
1985 June to Oct.1992
MIL CONTROLS LTD, MALA, INDIAas QA/QC Engineer October1997 to April 1999 (formerly M/s. Masoneilan India Limited)
An ISO 9001Group Company of KSB AG, Germany, countries leading Manufacturers of Control Valves, Level Instruments and itsAccessories.
Fabrication and erection inspection of Valves at site, Inspection of valves, castings, coating,
Types of Projects worked:
OIL & GAS Construction projects
GazlanPower plant Project
Offshore oil jacket project
Offshore Living quarters project
Cochin Refinery maintenance project
Structural steel fabrication/Erection –Infrastructure projects(Dubai International Airport Expansion Project, Dubal potline7 and Cast House Project, Dubal SILO7 Project, Festival city Project,Dubai Duty free ware house Project, Dubai world trade centre Exhibition Hall Project).
Power plant shutdown project-Fujairah
Takreer Refinery Expansion Project (EPC-6)