Superior Industrial Engineer
MEP Engineer
EDUCATION HISTORY
SEP-1999 MAY-2005 SUPERIOR INDUSTRIAL ENGINEER
UNIVERSITY MIGUEL HERNÁNDEZ FROM ELCHE
(ALICANTE)
FINAL PROJECT OF THE CAREER: “REVIEW AND ANALYSE TECHNIQUES FOR SEGMENTATION AND IDENTIFICATION OF ELECTRICAL CONSUMERS IN LIBERALISED MARKETS”. BY USING THE SOFTWARE “MATLAB”.
LANGUAGE SKILLS
SPANISH, ENGLISH, VALENCIANO / CATALÁN, FRENCH
CERTIFICATIONS AND ACCREDITATIONS
OCT-2008 JUL-2009
MASTER DE ESPECIALIZACIÓN EN ESTRUCTURAS DE CYPE
Imparted by ZIGURAT
FEB-2012 MAR-2012
CÁLCULO DE CERCHAS CON PERFILES TUBULARES DE CYPE
Imparted by ZIGURAT
AGO-2013
THEORY OF PARTIAL DISCHARGES AND PARTIAL DISCHARGES MEASUREMENTES ON HV CABLES
Imparted by TECHIMP
WORK HISTORY & EXPERIENCE
COMPANY ACTIVITY
JUL-2005 NOV-2005 GO OZONE, S. L. CONSTRUCTION
POSITION DETAILS: ENGINEER (PROJECT MANAGER) FOR THE CONSTRUCTION OF A BOWLING ALLEY LOCATED IN IBIZA (BALEARES – SPAIN).
DIC-2005 JUN-2006 ELECTRICIDAD OLMOS, S. L. ELECTRICITY, AUTOMATION AND PROJECT MANAGMENT
POSITION DETAILS: INDUSTRIAL ENGINEER AND PROJECT MANAGER IN THE DIRECTION OF DIVERSE PROJECTS IN THE PROVINCE OF ALICANTE.
DUTIES: COORDINATE ALL WORKERS THAT ARE ON THE BUILD AND PROVIDE THEM TECHNICAL SUPPORT FOR THE DECISIONS.
JUL-2006 SEP-2007 GRUPO TECOURBANA, S. L. BUILDING CONSTRUCTION
POSITION DETAILS: INDUSTRIAL ENGINEER (PROJECT MANAGER) OF A CONSTRUCTION COMPANY LOCATED IN ELCHE (ALICANTE – SPAIN).
SEP-2007 MAY-2013 FREELANCE INDUSTRIAL ENGINEER
POSITION DETAILS: INDUSTRIAL ENGINEER (PROJECT MANAGER), DOING BUILDING, INDUSTRIAL AND CIVIL PROJECTS. PERFORMING TECHNICAL LEADERSHIP AND EXECUTION OF EACH PROJECT.
JUN-2013 SEP-2013 TAYEB HV SYSTEMS INDUSTRIAL ENGINEER
POSITION DETAILS: INDUSTRIAL ENGINEER (TECHNICAL MANAGER), DOING HIGH VOLTAGE TESTS AND PROJECTS. PERFORMING TECHNICAL LEADERSHIP AND EXECUTION OF EACH PROJECT.
SOME OF MY LISTED JOBS:
• QUÍMICAS SANZ, S.L. (REDOVÁN – ALICANTE): IMPROVEMENT OF THE PRODUCTIVE PROCESS, AUTOMATION OF THE PRODUCTIVE PROCESS. RENOVATION OF THE ELECTRICAL INSTALATION OF THE CHEMISTRY INDUSTRY. APROX. BUDGET: 280.000,00 €. APROX. DURATION: 10 MONTHS.
• ARBORA & AUSONIA (JIJONA – ALICANTE): IMPROVEMENT OF THE PRODUCTIVE PROCESS. CHANGES IN THE PRODUCTION LINES. CONTINUE IMPROVEMENT OF THE AUTOMATION AND ELECTRICITY.AUTOMATION PROGRAMMING, ABB ROBOTS PROMAMMING.
• URBANIZATION POLÍGONO A. PLAN PARCIAL 1º-4 “ALBUFERETA” ALICANTE (ALICANTE).
PROMOTOR: NOZAR, S.A. DESIGN, PROJECTS AND DIRECCION OF THE BUILDING WORK. LEGALIZATIONS OF THE ENTIRE ELECTRIC INFRASTRUCTURE (LIGHTING, M.T., B.T., TRANSFORMERS). APROX. BUDGET: 16 MILLION EUROS.
• BEMARSA (STONE INDUSTRY) (ELDA – ALICANTE): DESIGN, PROJECTS AND DIRECCION OF THE BUILDING WORK OF THE NEW INDUSTRY. APROX. BUDGET: 1,8 MILLION EUROS.
• OBRADOR ADHESIVOS, S.L. (ELDA – ALICANTE): DESIGN, PROJECTS AND DIRECCION OF THE BUILDING WORK. DESIGN OF ALL THE NEW INSTALATIONS OF THE INDUSTRY, INCLUDING ELECTRICITY, PLUMBING, FIRE PREVENTION, ETC. APROX. BUDGET: 1,2 MILLION EUROS.
• URBANIZACIÓN DEL SECTOR SUP-3 DE SAN JUAN (ALICANTE). PROMOTOR: REYAL URBIS.
DESIGN, PROJECTS AND DIRECCION OF THE BUILDING WORK. LEGALIZATIONS OF THE ENTIRE ELECTRIC INFRASTRUCTURE APROX. BUDGET: 8 MILLION EUROS.
• GIMPEX ADHESIVOS, S.L. (PETRER – ALICANTE). IMPROVEMENT OF THE PRODUCTIVE PROCESS AND MODIFICATION OF PART OF THE ELECTRICAL INSTALATION. APROX. BUDGET: 210.000,00 €.
• ELDAMAR, S.A. (ELDA-ALICANTE). DESIGN, PROJECTS AND DIRECCION OF THE BUILDING WORK TRAMITS AND LEGALIZATIONS OF ALL THE INSTALATIONS (ELECTRICITY, VENTILATION, PLUMBING, SOLAR ENERGY, ETC.) OF A BUILDING WITH 127 HOMES, LOCALS AND THREE PLANTS OF GARAGES. APROX. BUDGET: 2,5 MILLONES DE EUROS.
• TACOMA SHOES, S.L. (PETRER – ALICANTE): RENOVATION OF PART OF THE INDUSTRY.
• SOGESTÍN, S.L. (PETRER – ALICANTE): SHOPPING CENTRE “BASSA EL MORO”. PROJECTS AND DIRECCION OF THE BUILDING WORK OF ALL THE INSTALATIONS OF THE CENTRE (ELECTRICITY, PLUMBING, CLIMA, VENTILATION, FIRE PREVENTION, ETC.). APROX. BUDGET: 3 MILLION EUROS.
• HOSPITAL (ELCHE – CREVILLENTE): DESIGN, PROJECTS AND DIRECCION OF THE BUILDING WORK OF ALL THE INSTALATIONS OF THE HOSPITAL (ELECTRICITY, PLUMBING, CLIMA, VENTILATION, FIRE PREVENTION, ETC.). APROX. BUDGET: 10 MILLION EUROS.
• INTERNATIONAL EXPERIENCE WORKING IN SEVERAL PROJECTS (HYDRO, ELECTRICAL, NUCLEAR, PETROQUIMICAL, GAS, ETC.) WITH EUROPEAID FOR FIVE YEARS.
APART OF THE MENTIONED WORKS, I HAVE DONE A LOT OF DESIGNS, PROJECTS AND WORK DIRECTIONS OF RESIDENTIAL BUILDINGS, INDUSTRIES, COMERCES AND URBANIZATIONS, ALMOST ALL IN ELECTRICITY DESIGNS, PLUMBING, FIRE PREVENTION, VENTILATION, AUTOMATION, ACOUSTIC, PIPING, ETC.
I HAVE EIGHT YEARS OF EXPERIENCE IN LEADING TEAMS FROM FIVE TO FIFTEEN ENGINEERS IN SEVERAL SPECIALITIES IN THE CONSTRUCTION AND INDUSTRY SECTOR.
COMPUTER SKILLS
AUTOCAD.
AUTODESK INVENTOR / MECHANICAL DESKTOP / HYPERMILL
CYPE (ARQUÍMEDES Y CONTROL DE OBRA, CYPELECT, CYPECAD, METAL3D, INSTALACIONES EN EDIFICIOS, GENERADOR DE PÓRTICOS)
DMELECT, DMCAD
ANSYS
DERIVE
ETAP
LINUX / UNIX
MATLAB
SIMULINK
LABVIEW
NEN
MS EXCEL
MS WORD
MS POWERPOINT
MS PROJECT
DIALUX
PLC´S
PRIMAVERA
ECODIAL
CATIA V5
PAQUETES ESTADÍSTICOS (SPSS, SOLVER)
PROGRAMACIÓN DE AUTÓMATAS (SIEMENS, ROCKWELL)
ABB ROBOTS
PROGRAMACIÓN C / C++
PROGRAMACIÓN JAVA
PROGRAMACIÓN LENGUAJE ENSAMBLADOR
PSPICE / ORCAD
VISUAL BASIC