WORK EXPERIENCE
26 December 2012 – 15 september 2013 CONSTRUCTION/PIPING SUPERVISOR
MAIRE TECNIMONT, Abu-Dhabi (United Arab Emirates)
MEGA PROJECT GAS PLANT HABSHAN5 (GASCO)
Supervising piping work to be perfomed by construction contractor and ensure the compilance with established construction schedule and project requirements.
Coordinate among various construction contractor and discipline supervisor executing piping work.
Verify the availibility and adequacy of the materials and drawings.
Evaluate the construction contractor work capability according to the programs to be implemented and promote corrective actions where necessary.
Ensure the proper execution of inspection and tests in accordance with the field quality control plan and monitor the adequacy results.
Give assistance to piping superintendent in the discussion with the proponente representative and construction contractor where necessary.
Assist in the field engineering works such as field revision of isometric drawings.
Promote meetings to discuss all the requirements (pre-plannig and risk assessment) to issue all the PTW.
Follow the pre-commissioning and comissionnig activitys to prepar all the alterations( site instructions) to be done during pre-planed shutdowns.
04 January 2012 – 31 November 2012 CONSTRUCTION/PIPING SUPERVISOR
LEDCOR COMPANY, Edmonton (Canada)
MODULES TO DEVON AND ENCANA (OIL SANDS)
Coordinate the suport fabrication in workshop.
Follow all the activitys in the yard and inform QC when the pipe systems are ready to be tested and inspected.
Preparation of hidro-test packs.
Coordinate the systems flushing, tests and handover to the cliente according approved procedures.
Preparation and check all documents test-pack before testing.
Monitor and preparation of the work related to the activities of hidraulic tests.
Piping test-packs coordination with main contractor and client.
03 May 2010 – 06 December 2012 PIPING SUPERVISOR
JACOBS-ENGINEERING, SINES (Portugal)
MEGA PROJECT MEGA-PTA ( ARTLANT/ARTEMIUS ).
Subcontractor coordination with regards to their daily activitys.
Attend meetings and advise subcontractors the priorities to be taken into consideration.
Monitor work progress in accordance with their submited work schedule.
Attend internal meetings with others disciplines ( if required ) for matters to be clarify.
Monitor equipment, materials and availibility at the warehhouse.
Inform the group leader about any technical problems that may arise at the site to avoid delaying of working Schedule.
Checking the lines and preparing the punch list.
Coordinate with piping construction for closed the punch list.
01 November 2008 – 07 April 2010 PIPING FOREMAN
AMAL-CONSTRUÇOES LDA, SINES (Portugal)
RECONVERSAO DA REFINARIA DE SINES ( GALP )
Responsible for all steam tracing systems on the plant.
Deal and encourage a team with 35 professionals to work safety and at the same time to achieve the objectives we set ourselfes.
Installation of pipe systems, pumps, all kinf off vessels, dryers, valves, pumps.
The only team whithout LTI in all the project.
04 January 2006 – 29 September 2008 PIPING SUPERVISOR
HEEREMA CONSTRUCTION MARINES, ZWINDRECHT (Netherlands)
BP VALHALL DEVELOPMENT
Monitoring, preparation and supervision of works associated with activitys of the suport componentes of piping assembly.
Verification the modifications on plans of construction and preparation the as-builts if necessary.
Preparation of hidro-test packs.
Punch list and coordinate with piping construction for repairs before testing lines.
Assure the control of re-instatement lines on P&ID.
Control of all specifications for bolt torquing.
Monitor, preparation and supervision of work related activities insulation.
PERSONAL SKILLS
Mother tongue(s) Portuguese
English
Communication skills Mechanical completion, walkdowns, test runs, preparation test-packs, punch close, vibration punch close, valves, pumps, handed over, hydro-test, reinstatment, risk-assesment, ptw, building walkdowns
Computer skills word,excel