WORK EXPERIENCE
Job Experience
Experience Profile: EPC Business
• Electrical System Design Experience (Oil & Gas, Power Generation)
• Project Coordination (Oil & Gas)
• Field Engineering / Site Works (Oil & Gas)
Companies Worked For International Exposure
• JGC Corporation, Yokohama, Japan • Japan (1 Year)
• JGC Arabia, Saudi Arabia • Saudi Arabia
• Descon Integrated Projects Pvt. Ltd, Pakistan
Major Projects:
• ARAMCO – Manifa Project, Saudi Arabia (11 Billion USD)
• UCH-II Power Plant (400 MW Combined Cycle), Pakistan
Electrical Systems Design Experience
• Substation Design (Transformer, LV, MV Switchgear Schematics, SLD’s, Load List, Cable Schedule, Interconnection Diagrams, Conceptual Design, UPS, AC-DC System Design, Vendor Doc Review, System Specifications, Substation Automation System, Substation Layouts, RFQ & Datasheets)
• Cable System (Cable Sizing, Power Layouts, Cable Tray System etc)
• System Studies (Load Flow, Short Circuit, Motor Starting, Relay Coordination)
• Earthing System
• Lightning Protection System
• Communication System
• Fire Alarm System
• Lighting System
• Hazardous Area Classification
• Cathodic Protection System
• BOQ, MTO, Layouts, RFQ’s, Specification, Layout & Proposal Work Related to Above Electrical Systems Works
• Calculations for All Electrical Systems
Job History
Descon Integrated Projects Limited, Pakistan
Project: UCH Power Plant (400MW Combined Cycle), Pakistan
Designation: Engineer
Responsibilities: Area-Lead
• Substation Equipment Design (Transformer, LV & MV Switchgear)
• Single Line Diagram (MV, LV), Load List, Cable Schedule,
• Schematics & Vendor Document Review, Interconnection Diagrams
• Requisitions, Datasheets (LV & MV Switchgear, Generator, Transformer)
• Equipment Sizing (Transformer, Emergency Generator, UPS etc)
• Factory Acceptance Test Switchgear
Proposal Lead: Trans-Asia Oil Refinary, Pakistan & Coal Baggas Power Plant
Responsibilities: Electrical Power System Design (Switchgear, Transformers, HIS Switchyard, Emergency Generator, Bus-Duct etc)
Electrical System Design: MTO, BOQ & Cost Preparation for Power System Equipment, Lighting System, Grounding System, Fire Alarm, Cathodic Protection & Hybrid Switchyard Equipment.
JGC Arabia Limited, Saudi Arabia
Project: Aramco – Manifa Oilfield, Saudia Arabia.
Designation: Field Engineer
Area of Work:
• Substation
• Utilities Plant Area
Responsibilities:
• Ensured the Implementation of Aramco & International Standards
• Substation Automation System
• Coordination with ARAMCO to resolve construction concerns
• Coordination with vendor for pre-commissioning activities
• Coordination with the Construction teams
• Design Updates as per Site Conditions
JGC Corporation, Japan
Project: Aramco – Manifa Oilfield, Saudia Arabia.
Designation: Design Engineer & Project Coordinator
Experienced managing 40,000 MHRs Project at JGC Cooperation, Yokohama, Japan as Project Coordinator. Major responsibilities included:
• Scheduling Project Activities
• 3D Model Review & Guidelines Developments
• Inter-discipline Coordination
• Coordination to resolve Design Issues
• Electrical Systems design review including:
Power Systems Elementary Diagrams
Grounding Systems Cable Tray Systems
Descon Integrated Projects (Pvt.) Limited, Pakistan
(Formerly JGC-DESCON Engineering (Pvt.) Limited) EPC Company
Designation: Design Engineer
Projects:
1) Asphalt Blowing Unit Parco, Pakistan
2) Sharourah Power Plant Extension, Saudia Arabia
3) Bhikki Power Plant, Pakistan
4) Fatima Fertilizer Plant, Pakistan
5) Kandhkot Project, Pakistan
6) Byco, Bosicar Sindh, Pakistan
Software Development:
1) Impressed Current Cathodic Protection System for Pipelines
2) Cable Tray Sizing Spread Sheet
January 2012 Till Present
UEC (Pvt.) Limited Pakistan August 2008 – November 2008
Instrument Engineer
Technical & Commercial Support for Pressure & Heat Instruments, Yokogawa Electric Corporation.
TRAINING/WORKSHOPS
ETAP TRANING at ELTECHS Japan November 2010 Basics of Relay Coordination & ETAP Star Module
ECTRICAL STANDARDS
IEEE IEC British Standards
NEC / NFPA Saudi Aramco Standard
ELECTRICAL TOOLS
ETAP LUXICON Smart Plant Review & Naviswork
PDS Micro-Station Auto-Cad
EDUCATION:
University of Engineering and Technology Lahore
Bachelors in Electrical Engineering 2004-2008
FSc Additional Mathematics 2003-2004
Government College University Lahore
FSc Pre-Medical 2001-2003
Divisional Public School Model Town Lahore
Matriculation 1999-2001
ACADEMIC PROJECTS
University Senior Year Project
Security Enhancement of Asterisk (PBX) Software