Internationally experienced Subsea CAD Designer

Available
Serial No: 12163
Skills keywords: 
Current location:  Tamil Nadu, India - View on map
Nationality: Indian
Spoken languages: english, Tamil

EDUCATION

Institution SANJOSE MATRICULATION SCHOOL SRI RAMA KRISHNA VIDAYALAYA

ITC C.I.T SANDWICH

POLYTECHNIC

COLLEGE

Level of Examination SSLC ITI DIPLOMA IN MECHANICAL ENGG. PART TIME

Software Known : PRO-E, Inventor, Solid Works, Auto CAD

Areas of interest : Auto Mobile, manufactuing, Design & Development

Databases and Tools worked On : SAP, BOM Creation, VAULT.

WORK EXPERIENCE

Major Assignments handled since inception into CAMERON on 07thJuly 08

Project: Subsea Wellheads & Running Tools

Client Chevron

Environment: Inventor & SAP

Role: Project Executor & Developer

Brief description of the project:

The project deals with creation of 3D models and Drawings using Inventor from AutoCAD Drawings to sales order projects which will be released for production. This Wellhead will be a Cameron’s unique model and it will compete in both export and domestic markets. This is an improved performance, quality and oil and gas field.

Responsible for:

• Creation of layout for the new concept for the Running tools like BOP Test tool, Wear sleeve running tool, Conductor Housing Running Tool.

• Creation of Mechanical calculations in Mathcad.

• Creation of Forging Drawings using API Standards and Machining Drawings per ASMI Y14.5 Standards.

• Creation of BOM in SAP PLM environment to facilitate manufacturing.

• Creation of a Equipment testing Fixtures.

Projects handled:

Project: Case Study of FPRs

Client BP (BRITISH PETROLEUM)

Environment: SAP, Excel Spread Sheet

Role: Developer

Brief description of the project:

The main goal of the Case study is to identify the failure modes related to the loss of the intended system function. It is basically an analytical technique, which may be used to examine the functions from a customer point of view, so as to minimize failures at initial design stage.

Responsible for:

 To identify & analysis the failure modes and their effects on the system functions.

 To rank the failure modes according to the combination of severity and the probability of that failure mode occurring (Criticality Analysis).

 Final FMECA report is generated based on the source and submitted to the customer.

Projects handled in New Product Development

Project: Vertical Monobore Tree 15K ( New Product Development )

Client Chevron ( Alder ,North Sea, UK )

Environment: Proposal Layouts , New Combo Tools, & Development of Lower Tree System

Role: Developer & Team Player

Brief description of the project:

The Main Goal of this project is to develop the New Vertical Tree in the Market with New Features ( Primary Design Stages are done by GHQ team). To create a bench mark on the Cameron’s Histroy this project has been developed from 2011 to till date.

Responsible for:

 To Create a New Proposal Layout for the Tubing hanger Handling & installation come retrieving tool, TH emergency Recovery Tool Etc…

 Once the layout have been approved then Creation of Forging Drawings, Machining Drawing and Tolerance stack up Analysis will be done.

 Creation of Load Calculation for the Components.

 Material selection for the Components.

 Selection of weld spec.

 Creation of Shipping Skids for the Running Tools & Other Tree Related items

Projects handled in OFFSHORE SUPPORT TEAM

Project: Vertical Monobore Tree 10K

Client Shell ( Gyrfalcon Project Gulf of Mexico )

Environment: To abandonment a Well & To Retrieve a Xmas Tree from the Sea

Role: Developer & Team Player

Brief description of the project:

The Main Goal of this project is to abandonment the well which has completed the production. The Production has stared in 1998 the life cycle of the tree is 25years. Once the reservoir is closed the tree should be retrieved from the Subsea. We have supported the offshore support team in this project and the tree have been success fully Retrieved from the Site.

Responsible for:

 To Create a Layout for the Tubing hanger emergency Recovery Tool to recover the Tubing Hanger from the Tubing Spool.

 Creation of Load Calculation for the Components.

 Material selection for the Components.

 Selection of weld spec.

Creation of Shipping Skids for the Running Tools & Other Tree Related items

Projects handled in Cameron UK ( London) From July 13 to Dec 13

Project: TOTAL KAOMBO BLOCK 32 ANGOLA Field Development

Client TOTAL

Environment: System Engineering

Role: Team Player

Brief description of the project:

The Main Goal of this project is to Create a Field Layout & Field Architecture for the Block32. Field Schematics, Control Systems, X-MAS Tree Process Drawings, Manifolds & PFD

Responsible for:

 To Create a Field Layout for the TOTAL KAMBO Fields.

 Creation of field Schematics.

 X-MAS Tree Process Diagram.

 Creation of Manifolds P&ID.

 Creation of Process Flow Diagram For Entire Fields

 Creation of Scope of Supply Drawings

Projects handled in Cameron UK ( London) From July 2013 to Dec 213

Project: TREE ALIGNMENT FRAME

Client PETROBEL DEKA

Environment: System Engineering

Role: Team Player

Brief description of the project:

The Main Goal of this project is to Create a Tree Alignment Frame to Align the X-MAS Tree in the Fishing Protection Structure.

Responsible for:

 To Create a Layout for the Alignment Frame.

 Creation of Design Files & Calculation.

 Creation of Fabrication Drawings.

 Creation of Interface Drawings.

Major Assignments handled in Lakshmi Electrical Drives Ltd

Project: A.C induction motor and Tooling Development

Client Enarcon , ABB, Reel ITALY, Dietz

Environment: Inventor & SAP

Role: Project Executor & Developer

Brief description of the Work:

• Working as a senior – Mechanical Design Team in Lakshmi elelctrical drives Ltd” an ISO 9001-2000 Company, one of the leading manufacturers of A.C induction motor for textile machines.

Responsible for:

• Extraction, Transformation and Loading from source (AutoCAD) to target (3D Modeling) using Inventor 2010.

• Creation of inventor Drawings using GD&T and ISO Standards.

• Creation of BOM in SAP PLM environment to facilitate manufacturing.

• Creation of layouts & proposal drawings.

• Creation of Pattern layouts & core boxes

• Creation of jigs & CNC Fixtures for turning & machining centers

Major Assignments handled in – AQUA SUB ENGG Coimbatore- 14 .

Project: Tooling Development

Client Aqua Sub Engg

Environment: Inventor Auto cad & SAP

Role: Project Executor & Developer

Brief description of the Work:

• Working as a senior – Mechanical Design Team in AQUA SUB ENGG an ISO 9001-2000 Company, one of the leading manufacturers of Submersible pumps & motors for Agriculture & domestic purpose

Responsible for:.

• Creation of Pattern & core boxes of new development components.

• Creation of layouts & proposal drawings.

• Creation of jigs & CNC Fixtures for turning & machining centers

Current CTC: 5.5LAKHS per Annum

Notice period: 3months

 






popup-img