EDUCATION
Institution SANJOSE MATRICULATION SCHOOL SRI RAMA KRISHNA VIDAYALAYA
ITC C.I.T SANDWICH
POLYTECHNIC
COLLEGE
Level of Examination SSLC ITI DIPLOMA IN MECHANICAL ENGG. PART TIME
Software Known : PRO-E, Inventor, Solid Works, Auto CAD
Areas of interest : Auto Mobile, manufactuing, Design & Development
Databases and Tools worked On : SAP, BOM Creation, VAULT.
WORK EXPERIENCE
Major Assignments handled since inception into CAMERON on 07thJuly 08
Project: Subsea Wellheads & Running Tools
Client Chevron
Environment: Inventor & SAP
Role: Project Executor & Developer
Brief description of the project:
The project deals with creation of 3D models and Drawings using Inventor from AutoCAD Drawings to sales order projects which will be released for production. This Wellhead will be a Cameron’s unique model and it will compete in both export and domestic markets. This is an improved performance, quality and oil and gas field.
Responsible for:
• Creation of layout for the new concept for the Running tools like BOP Test tool, Wear sleeve running tool, Conductor Housing Running Tool.
• Creation of Mechanical calculations in Mathcad.
• Creation of Forging Drawings using API Standards and Machining Drawings per ASMI Y14.5 Standards.
• Creation of BOM in SAP PLM environment to facilitate manufacturing.
• Creation of a Equipment testing Fixtures.
Projects handled:
Project: Case Study of FPRs
Client BP (BRITISH PETROLEUM)
Environment: SAP, Excel Spread Sheet
Role: Developer
Brief description of the project:
The main goal of the Case study is to identify the failure modes related to the loss of the intended system function. It is basically an analytical technique, which may be used to examine the functions from a customer point of view, so as to minimize failures at initial design stage.
Responsible for:
To identify & analysis the failure modes and their effects on the system functions.
To rank the failure modes according to the combination of severity and the probability of that failure mode occurring (Criticality Analysis).
Final FMECA report is generated based on the source and submitted to the customer.
Projects handled in New Product Development
Project: Vertical Monobore Tree 15K ( New Product Development )
Client Chevron ( Alder ,North Sea, UK )
Environment: Proposal Layouts , New Combo Tools, & Development of Lower Tree System
Role: Developer & Team Player
Brief description of the project:
The Main Goal of this project is to develop the New Vertical Tree in the Market with New Features ( Primary Design Stages are done by GHQ team). To create a bench mark on the Cameron’s Histroy this project has been developed from 2011 to till date.
Responsible for:
To Create a New Proposal Layout for the Tubing hanger Handling & installation come retrieving tool, TH emergency Recovery Tool Etc…
Once the layout have been approved then Creation of Forging Drawings, Machining Drawing and Tolerance stack up Analysis will be done.
Creation of Load Calculation for the Components.
Material selection for the Components.
Selection of weld spec.
Creation of Shipping Skids for the Running Tools & Other Tree Related items
Projects handled in OFFSHORE SUPPORT TEAM
Project: Vertical Monobore Tree 10K
Client Shell ( Gyrfalcon Project Gulf of Mexico )
Environment: To abandonment a Well & To Retrieve a Xmas Tree from the Sea
Role: Developer & Team Player
Brief description of the project:
The Main Goal of this project is to abandonment the well which has completed the production. The Production has stared in 1998 the life cycle of the tree is 25years. Once the reservoir is closed the tree should be retrieved from the Subsea. We have supported the offshore support team in this project and the tree have been success fully Retrieved from the Site.
Responsible for:
To Create a Layout for the Tubing hanger emergency Recovery Tool to recover the Tubing Hanger from the Tubing Spool.
Creation of Load Calculation for the Components.
Material selection for the Components.
Selection of weld spec.
Creation of Shipping Skids for the Running Tools & Other Tree Related items
Projects handled in Cameron UK ( London) From July 13 to Dec 13
Project: TOTAL KAOMBO BLOCK 32 ANGOLA Field Development
Client TOTAL
Environment: System Engineering
Role: Team Player
Brief description of the project:
The Main Goal of this project is to Create a Field Layout & Field Architecture for the Block32. Field Schematics, Control Systems, X-MAS Tree Process Drawings, Manifolds & PFD
Responsible for:
To Create a Field Layout for the TOTAL KAMBO Fields.
Creation of field Schematics.
X-MAS Tree Process Diagram.
Creation of Manifolds P&ID.
Creation of Process Flow Diagram For Entire Fields
Creation of Scope of Supply Drawings
Projects handled in Cameron UK ( London) From July 2013 to Dec 213
Project: TREE ALIGNMENT FRAME
Client PETROBEL DEKA
Environment: System Engineering
Role: Team Player
Brief description of the project:
The Main Goal of this project is to Create a Tree Alignment Frame to Align the X-MAS Tree in the Fishing Protection Structure.
Responsible for:
To Create a Layout for the Alignment Frame.
Creation of Design Files & Calculation.
Creation of Fabrication Drawings.
Creation of Interface Drawings.
Major Assignments handled in Lakshmi Electrical Drives Ltd
Project: A.C induction motor and Tooling Development
Client Enarcon , ABB, Reel ITALY, Dietz
Environment: Inventor & SAP
Role: Project Executor & Developer
Brief description of the Work:
• Working as a senior – Mechanical Design Team in Lakshmi elelctrical drives Ltd” an ISO 9001-2000 Company, one of the leading manufacturers of A.C induction motor for textile machines.
Responsible for:
• Extraction, Transformation and Loading from source (AutoCAD) to target (3D Modeling) using Inventor 2010.
• Creation of inventor Drawings using GD&T and ISO Standards.
• Creation of BOM in SAP PLM environment to facilitate manufacturing.
• Creation of layouts & proposal drawings.
• Creation of Pattern layouts & core boxes
• Creation of jigs & CNC Fixtures for turning & machining centers
Major Assignments handled in – AQUA SUB ENGG Coimbatore- 14 .
Project: Tooling Development
Client Aqua Sub Engg
Environment: Inventor Auto cad & SAP
Role: Project Executor & Developer
Brief description of the Work:
• Working as a senior – Mechanical Design Team in AQUA SUB ENGG an ISO 9001-2000 Company, one of the leading manufacturers of Submersible pumps & motors for Agriculture & domestic purpose
Responsible for:.
• Creation of Pattern & core boxes of new development components.
• Creation of layouts & proposal drawings.
• Creation of jigs & CNC Fixtures for turning & machining centers
Current CTC: 5.5LAKHS per Annum
Notice period: 3months