EDUCATION
Secondary School Education Matric 10th (SSE)
New Light Ali Ghar English High School (2001)
Gujranwala city, Pakistan
Intermediate Faculty Education 12th
Gov College Gujranwala, Pakistan (2003)
Graduate Arts 14th
Punjab University Lahore, Pakistan (2006)
Certification & Technical Training
Diploma Telecommunications Systems engineering
Skill Development Council Gov Punjab Lahore, Pakistan (2013)
Certification Fiber Optic splicing& Testing
Skill Development Council Gov Punjab Lahore, Pakistan (2013)
Certificate of Basic First Aid and CPR
(DIT) Accreditation Program- Saudi Arabia 27-Mar-2017. Certificate No: DITEC632406
To verify certificate validity, please visit the IADC website: http://www.iadc.org
Intercom Systems Installation
Dubai, UAE. (2019)
Nayatell IT Infrastructure LLC
(NOV 2018 – Present)
Dubai, UAE
IT Infrastructure Supervisor
Preformed installations, repairs, diagnostics, and managed work orders for commercial and residential customers
Provided technical support and service to the company at every level and every location, including equipment recommendations, installation, configuration, testing, training, troubleshooting, repairs, moves, and upgrades.
development and maintenance of a safe work environment to meet all health and safety standards
resolution of critical issues in a time-sensitive environment using excellent Technical skills
Maintained and referenced industry standards including ANSI, EIA/TIA and local and national Electric Code.
Troubleshoot computers for internet connectivity
Installed aerial/underground drops, wall fished cable, cat5,6 STP,UTP,FTP,
Handle the fiber optic cable Splicing Testing Termination Installation SM MM
Network Testing Fluke Testing&OTDR Testing as per requirement.
Respond to service calls when network issues are deemed to be the result of hardware failures.
Seder Telecom Group APD (Aug2013 – Nov 2017)
Saudi Arabia, Jeddah
Field Fixed Maintenance Engineer
4 years progressive experience in Telecom transmission for Installation, Testing, Commissioning, Administration, Operation & Maintenance for FOC, SDH, DWDM Networks used as a Long Distance & Junction.HUAWEI TECHNOLOGY O&M TRANSMMISION MOBILY PROJECT,GPON,FTTx TXM MS, Working As Fixed Field Maintenance Engineer (FFME) Aug Responsible for Huawei, Alcatel Lucent, ciana, CISCO ADMs,GPON OLT,FTTX, Maintenance in Mobily Network
Huawei,Eqpt: OSN500, OSN550, OSN1500, OSN3500, OSN7500, OSN7500II, OSN9500, NE40, NE5000 Core Network.
BICON, DWDM O&M of Huawei Long Distance Network Eqpt: (Huawei OSN6800, OSN8800)
GPON / MDU O&M of Huawei GPON/FTTB Network: (Huawei MA5600/MA5603 and its variants)(Huawei FTTM,FTM,5600)
MDU PAT 5698 GSM SITES 3g 4g Migration
Responsible for trouble shooting of different alarms escalated by TNOC
Responsible for the replacement of faulty cards.
Testing and troubleshooting of STM links through SDH analyzer.
Testing and troubleshooting of GBE and FE links through Ethernet analyzer.
Responsible for connectivity of Optical and E1 SORs.
Provide technical support for SOR connectivity to teams.
Discussing and solving the blocking issues regarding the SOR with the requester.
Patching & Dispatching as per SOR Noc. Responsible for optical cutovers.
Responsible for the acceptance of new Huawei, ALU, CISCO ADMs (PAT) in the network.
Performed JV and tests with different Mobily vendors. (Huawei, ALU, CISCO)
Performed PMR of Huawei optical nodes as per Huawei and Mobily standards.
Preparation of detailed technical report during any outage or failure.
Tools Using, Light Source ,Power Meter, VFL, Punching Down Tool, Labeling Machine.
Preparation of daily FME activity reports.
Perform regular and emergency duties during any emergency / down time
Directly reporting to regional Team Leader.
Work With Popper Following EHS rules and regulations.
Using Mateline Software/OWS
Alternative Technologies (Nov2009 – Jan 2011)
Saudi Arabia, Riyadh
Fiber Optic Infrastructure Technician
Installation Copper Cable UTP,STP,FTP Cat 5, Cat 6, Cat6A,Crimping RJ45 straight& cross Connection.
Fiber Optic SM,MM,Termination & Splicing Testing
Installation Rack cabling Dressing & Routers, switches, Termination Patch Panel.
Using tools Power Meter/Light Sources and VFLs.
Fluke1800DTX Test OTDR Expo FTB01
Install CCTV Cameras Analog & IP
Understand Drawing.
Installation Maintains of all kind of conduits
LAN/WAN
Cisco ,SYSTIMAX, LEGRAND, PADIUT, 3M