Mechanical Engineer, familiar with SAP system

Available
Serial No: 15604
Skills keywords: 
Current location:  চট্টগ্রাম বিভাগ, Bangladesh - View on map
Nationality: Bangladeshi
Spoken languages: Bangla, english

Education/Qualifications

B.Sc. in Mechanical Engineering from DUET in 2009.

Diploma in Mechanical Technology from Chittagong Polytechnic Institute in 2004.

Secondary School Certificate from Science in 2000.

Career Experience 

Present Assignment
Working with Bayer CropScience Ltd BD, from July, 2010 as ‘Production Engineer’.

Key Responsibilities:

• Production and maintenance planning and supervise execution.

• Responsible for Material Requirement Planning, Inventory Management in SAP system.

• Maintain relation with global team for new project introducing in Tongi site.

• Responsible for factory up gradation project.

• Look after overall purchase activities related to factory.

• Strong relation with other departments for smooth operation of factory.

• Work with QHSE for different audit observations

• Participate in Sales and Operation meeting for Country Business.

Key Achievements:

• Successfully complete Installation and commissioning of new 4 head liquid filling and 1 head capping machine with automated labeling machine.

• Successfully complete Installation and commissioning of new powder packing machine with integrated ducting system.

• Complete Hazardous Area Classification and Risk Assessment (HACRA) for the Plant

• By accurate planning reduce inventory of RM, PM and FG by 25%

• Reduce the number of contractual workers by 40%

• Developed new design for all pack size

• Participate in a project of constructing 16000 sft state of the art warehouses at Jessore.

• Developed Fire detection system in Tongi site.

Previous Assignment

Worked with DADA Group of Companies (December, 09 to June, 10) as Assistant Engineer – Maintenance. Working with this business proposition from the erection stage.

Key Responsibilities:

 Install new machineries

 Maintenance of plant machineries

 Procurement of spares and inventory control

 Involved in complete Shop Floor activities

 Involved in different new product startups

 Worked on reducing the machine Down time and improving usage of Raw & Packing material

Key Achievements:

 Successfully complete Installation and commissioning of Ad converter Machine.

 Complete installation of Boiler, Compressor and Sub Station.

 Complete civil construction of 800 sqm.

 Fulfill all requirement for machinery installation, including coordination and follow-up with contractors, experts from overseas

 Develop Fire Fighting Policy

 






popup-img