Completed Diploma in Mechanical Engineering and I have Piping engineering Certificate.
I have 11 years' experience in oil and gas, petrochemical projects.
I have experience fabrication, erection, installation, testing, pre-commissioning and commissioning activities of piping and Static Equipment.
I have Experience Documentation works like, As Built preparation, Test Pack Preparation, Test pack Marking, System Marking, System Handover.
walk-down, Parts System Mechanical Clearance (PSMC), System Mechanical Clearance(SMC), Pre-Start-Up Safety Review(PSSR).
Inspection and Insuring Operational accessibility and Maintainability of Piping Valve and Static Equipment.
1-Certificate in Piping Engineering from Indian Institute of Technology Bombe India.
2-Diploma in Mechanical Engineering KSO University.
3-10+2, Science.
4-10, Science
1- OQ8 Duqm Petrochemical Refinery Oman (Al Nahdha Group)
Responsibility -:
A-Performing as a Project Management Team, Walkdown with EPC team for PSMC, SMC,& PSSR, Inspection of Piping & Static Equipment and raised Technical, Operational and Maintainability difficulties and construction error or balance work.
B-Performing and Coordinating ITW for Static Equipment like, Heat Exchanger, Column,, Vessel, Tank, Skid and rotary equipment line Pump, Compressor, Fin fan and Steam Turbine. and Boiler, Heater, Furness, etc.
C-Verification of PSV, TSV and PRV, along with data sheet and P&ID.
D-Inspection and certified Piping Test package Re-instatement after Hydrotest and Flushing.
E-Maintainability survey of Static Equipment like, Heat Exchanger, Re-boiler Exchanger, Vessel, Column, Reactor, Heater, Furness, Filter, Mixer, Fin Fan Cooler etc.
F-Inspection and survey of Piping and Equipment Nozzle Flange Management (Flange Bolting), RTJ and RF Flange.
G-Maintainability and Operational accessibility survey of Valve.
H-Preparation Daily task Repot and reporting Team Leader.
2-NPCC Abu Dhabi UAE.
A- Supervising Fabrication and assembly well head platform.
B- Supervising Fabrication, Erection and installation of Structure, Piping and Static Equipment.
C-Piping Test Pack Preparation and Inspection at site.
D-Supervising Piping System Hydrotest/Pneumatic test
E-Piping system Water Flushing, Card Board Blasting and Cleaning.
F-Piping System Re-instatement and Connect with Equipment.
G-Piping system Air Flushing and maintaining Doe point.
H-Prepare Daily Work Progress report and reporting Area construction Manager.
I-Preparation work line a days ahead.
J-Daily Safety TBT conduction.
K-Insuring work force(Personal) Working safe and good environment.
L-Insuring work quality as per Standard.
Interested learning and practicing of Engineering
Environment Clean and Green.
Hard and Smart work.