Production Machine Designer

Available
Serial No: 9806
Skills keywords: 
Current location:  United Kingdom - View on map
Nationality: British
Spoken languages: english

Employment History

Sept 2009 – Present – Constar International UK Ltd

Projects Manager

Key Responsibilities

• Maximise utilisation of in-house labour for design, programming, testing and production line installation

• Remove production labour through automation

• Deliver innovations to offer customers significant advantages over competition

• Minimise all CapEx spends without compromising project specification

To achieve these objectives the vast majority of the design (both conceptual and technical), prototyping, programming, testing and assembly, were completed by myself. Learning new pieces of software and configuring new hardware was essential, only utilising contractors to obtain new skills or during large scale installations.

Key Projects

2010 – 2014 Preform Inspection Systems

o In-house turnkey solution including 3D CAD design, PLC and vision programming, assembly, testing, CE Marking and installation

o Incremental performance improvements in line speed (3-6 parts/second) and range of inspections (3 Cameras – 6 Cameras) across each iteration

o Systems are extremely versatile, run in-line with injection machines, offline for resorting and size change for all parts and colours in product range

o 4 Systems built with £200k total saving compared to comparable OEM Systems

o 400 million parts inspected to date with no quality complaints on any line

2013 – 2014 Plex Management System

o Specification, programming and integration of Maintenance, Tooling and Production Line Status packages

o Implementation of wireless tablets for Engineers and Operators, maximising communication across all shifts and minimising time to access technical data

o Saving in lost time £200k / yr and £40k in hardware and programming

2011 Closures Re-Development

o In-house designed integrated printing, inspection and packing solutions

o £140k saving / yr in manning and storage of finished product. £60k saving on Vision System builds compared to comparable OEM Systems

o 1.7 billion parts inspected to date with no quality complaints on either line

2010 and 2014 Blowing Re-Development

o In-house designed solution for automated pallet out-feed (2010) and a bottling, robotic palletising and wrapping line to integrate with the aforementioned (2014)

o Automated pallet out-feed manning saving of £100k / yr

o Robotics cell mould changeover saving of £185k / yr in labour and downtime

Dec 2006 – Aug 2009 – Ideas2Develop Ltd (Subsidiary of AESSEAL plc)

Product Development Engineer

Key Responsibilities

• Turnkey in-house 3D CAD design, prototyping and testing

• Patent analysis of existing IP relevant to each project

• Producing new Patent Applications to be sold to external companies

• Creation of sales literature and presentations

Largely working autonomously to achieve overall objectives resulted in developing a strong range of technical and commercial skills.

Key Project

2007-2009 Stackabox for First4boxes Ltd

o Turnkey IP, design, prototyping, testing and presentation services for an innovative returnable transportation and dispensing system aimed at the Preforms and Closures market

o Presentations and onsite product trails for prestigious companies including Constar International, Coca Cola Hellenic, Coca Cola Enterprises and Royal Mail

o IP was sold to DS Smith Replen and is now produced in the UK and sold globally

Jul – Aug 2006 / Jun – Sept 2005 – Pearson Edexcel (Summer Placement)

Team Leader Borderline Process

Key Responsibilities

• Generating work lists to ensure over 1 million GCSE exam papers requiring remarking were completed inside a 3 month period

• Liaising with IT Analysts to develop software infrastructure improvements

Jun – Sept 2004 – Hardcores Builders Merchants (Summer Placement)

Stock Controller

Key Responsibilities

• Stock level control

• Pre-picking orders for delivery

• Advising customers on product specifications and applications

Jun – Sept 2003 – Pagets Builders Merchants (Summer Placement)

Stock Controller / IT Integrator

Key Responsibilities

• Stock level control

• Developing and implementing a barcode system for entire product range

Formal Education

2003 – 2006 De Montfort University Degree Product Design BA (Hons) 2:1

2002 – 2003 Coventry University Diploma Foundation (Art and Design) Merit

1996 – 2002 Birkdale Senior School A Level Computing, IT, DT A

AS Level Geography A

 

Software Experience

• Solid Edge / Solid Works

• IPD Dalsa Sherlock

• Cognex Vision Pro and Insight

• UniOP – HMI Interfacing

• Omron – CX Programmer (PLC)

• Adobe Suite (Including Premiere, Photoshop, Illustrator)

• Microsoft Office (Word, Excel, PowerPoint, Publisher, Access, Projects)

 






popup-img