January 2003 Structural Analysis Program, Certificate
June 2005 Building Drawings by AutoCAD 3D, certificate
Jan 2007 Site Housekeeping
Feb 2007 Waterproofing to Buildings in superstructure
Feb 2007 Administration of Sub-contractors
Feb 2007 Finishing in Buildings conducted.
June 2007 Employee of the month certificate (E.C.C)
Sep 2007 Insurance in Construction conducted.
Dec 2007 Site Management
Jan 2008 Introduction in Safety and Healthy.
Feb 2009 Contract Administration (FIDIC 87/99).
1-Period: July 2015– Present
Name of Project: Lagoon & Bridges Detailed Design and supervision for Dubai Parks
Company: Al Nasr Contracting Company
Place: Dubai Parks, Dubai, U.A.E
Profession: Sr. Construction Manager
Contract Price: 200,000,000 AED
I have been worked as A Construction Manager, in Lagoon & Bridges Detailed Design and supervision for Dubai Parks project, which is contain a lake of water with 1.5 km length and bridges for the train and pedestrian, it’s contain 2 parts, lagoon with the bridges crossing over the lagoon and services Buildings around it to service this lagoon, Including the landscape package and Infrastructure (Pipelines, chamber and electrical services around it), I was in charge the Project mobilization , engineering work as well as the shop drawings issued.