FAMILIAR WITH VARIOUS CODES :

ASME IX: welding and welder’s qualification

ASME IIIV: pressure vessels

B31.1: power piping

B31.3 piping process

API 1104 : Welding of Pipeline and related Facilities

API 650: storage tank

API 653 : tank repair

API 5L : pipe

CODAP 2000: pressure vessel

AWS D1.1Structural codes for steel

ASME Sec.V Non-Destructive Testing)

API 570 : Piping Inspection

BS 12944: painting

GRADUATED LEVEL 

Mechanical High Technician Diploma

QUALIFICATION AND TRAINING

• Methods of welding, of non destructive testing, industrial metrology and modern systems of quality systems (CETIME Tunisia)

• Method of protection against corrosion (TIC).

• Inspection and verification of pressure vessel (TIC)

• Radiographic examination level II ( CETIME- TUNISIA)

• Welding inspector Level II (RINA)

• Welding Procedure Specification

• Procedure Qualification Record

• Welding Procedure Qualification

• NDT Inspector LEVEL II (RINA)

SKILLS

• Piping inspection

• mechanical inspection

• Steel fabrication quality control

• Pressure vessel inspection

• In factory reception

• Welding inspection

• Painting and coating inspection

• Storage tank Construction supervision

• Pipeline hydrotest

• Radiographic examination

• NDE request

• Steel structure fabrication and site erection.

• Corrosion and intégrity

EXPERIENCE

AUGUST 2006

Technique inspection et contrôle, inspection agency

• BGT British Gas Tunisian BranchHasdrubal project 

Construction of Gas station Hasdrubal plant:

– Data project : 5 million Nm3/hour Natural Gas station

– Position : piping inspector :

• Testing of 120 km of pipeline during manufacturing (NDT , destructive testing, hydro test)

• Inspection of PEHD and concrete coating of 80 km pipeline API 5L : holiday test, salt test….

• SHELL Company Ltd : Repair of 07 Tanks Storage 10 000 m3 :

– Position: Welding and Painting Inspector.

– ITP verification and Approval

– Standard : API 650 and API 653

– ITP verification and Approval

– Material Verification (Plates,Nozels,Valves,Flanges…)

– WPS and PQR Approval.

– Dimensional Check

– Consumable Check (Electrodes,Wires)

– Welding activities Monitoring

– NDT request

– Hydrotest .

– Painting Inspection ( thikness, dew point,…….)

• SAIPEM : HASDRUBAL project off shore 106km pipeline :

– Data project: 106 km 18” pipeline

– Position: QC welding and coating inspector

– WPS and PQR Approval.

– Pipe Fitter inspection

– Dimensional Check

– Consumable Check (Electrodes,Wires)

– Visual inspection

– Coating inspection (grit blasting check, hest shrink sleeves application check…….).

• SOMECO/PIONEER Company : QA/QC Engineer for Construction of the CPF Oil Station Jinen OilField (South Of Tunisia) :

– Data Project : 100 000 inch (Carbon Steel ,SS&Duplex)

– Standard: B31.3 , ASME IX; ASME V……….

– Welding activities Inspection

– Welding Book

– NDT request

– Punch List

– Hydrotest.

– Painting Inspection

• SOCOMENIN:

– TIFERT PROJECT

– Qality control inspector for steel structure fabrication.

– Visual Inspection.

– Dimensionnel check

– Fabrication drawngs verification.

• BOUCHAMAOUI INDUSTRIES : Gas pipeline Gabes – Zarzis – Djerba:

– Valves reception according API D : VALVITALIA – ITALY

– Gas filters reception : Technoforge – Italy

– Traps Reception : Technoforge – Italy

Gas Pipelines official hydrotests.

• PIONEER : El WAHA oil field:

– QA/QC engineer

– Visual inspection of weld

– Non destructif test monitoring

– Radiographic films reception

– Painting and coating inspection

TAV Construction : Construction of International airport of Enfidha– TUNISIA

– Position: QA/QC Inspector.

– Data Project : 7000 ton of steel structure & 12 km of piping fuel hydrant system ( kerosene)

– Material Verification (plates, piping, fittings, valves…)

– WPS and PQR Approval.

– Dimensional Check

– Consumable Check (Electrodes,Wires..)

– Welding visual inspection.

– NDT request

– Hydro test.

– Painting inspection ( thickness , dew point, humidity , …)

BRIGA PETROLEUM MARKETING – LIBYA

– Gas tank inspection ; 44000 L

– 150000 inch piping

– Two steam turbine

– Hydrotest

– Pneumatic test

– Wall thickness measurement and corrosion evaluation

– Radiographic examination

– Safety valves calibration

– General inspection and accessories check

– Inspection reports and certificates preparation.

– Piping inspection

– Checking of materials to be used prior to fabrication

– Inspection of Site Welding activities.

– NDT request.

– Test package monitoring

– Sand blasting and painting inspection.

– Storage tanks inspection monitoring.

DUBAI ALUMINIUM

Extension of the ALCOA Unit Project– DUBAI

– WPS approval

– Welding procedure qualification.

– Welder’s qualification

GHANNOUCH 1 x 400 MW combined cycle power station construction project– TUNISIA

– Position : QA/QC Inspector

– Data Project : 400 MW power Plant

• 08 Tank Storage API 650

• Osmosis Reverse Unit

• Combined Cycle Turbine 400MW

• 60 000 inch Piping Process ASME B31-3

• 1400 Tonnes Steel Structures.

– Painting inspection

– Welding inspection

– Checking of materials to be used prior to fabrication

– Inspection of Site Welding activities.

– Visual welding inspection

– NDT request.

Role & Responsibility as QA/QC Inspector

 Monitor the daily construction activities, perform daily site-inspections, and Ensure compliance with the QA/QC program, project drawings and Project specifications.

 QA/QC inspection ensures the compliance of construction & associated activities related to client approved drawing specification by inspection & witnessing & monitoring the activities.

 Ensuring implementation of Quality Control plan, procedure and inspection & test plan

 Familiar in ASME, API, ASTM, standard/ procedures, and Co-ordinate with client for QA/QC activities.

 Performing inspection as per ITP

 Review of Hydro test packages, Line checking and Punch listing

 Coordinate with construction, testing group and QC department in the preparation of test requirement of test pack and facilitate close out of any outstanding punch items before hydro test.

 Inspection of Pressure test (hydro, pneumatic) according to piping class, their test limit and required pressure along with PID.

 Involved in Reinstatement activities/clear the B punch item.

 Responsible for implementation of internal QA/QC programs, including Quality Improvement processes, quality management systems, inspection test planning procedures, receiving inspection plans, Quality Procedure Guidelines.

COMPUTER SKILLS

– Office automation softwares: Microsoft Excel, Microsoft PowerPoint, Microsoft Word…

– Operating systems: Windows 98; Windows 2000; Windows Xp

– Scientific Software: Autocad, SolidWorks, Catia V5