FAMILIAR WITH VARIOUS CODES :
ASME IX: welding and welder’s qualification
ASME IIIV: pressure vessels
B31.1: power piping
B31.3 piping process
API 1104 : Welding of Pipeline and related Facilities
API 650: storage tank
API 653 : tank repair
API 5L : pipe
CODAP 2000: pressure vessel
AWS D1.1Structural codes for steel
ASME Sec.V Non-Destructive Testing)
API 570 : Piping Inspection
BS 12944: painting
GRADUATED LEVEL
Mechanical High Technician Diploma
QUALIFICATION AND TRAINING
• Methods of welding, of non destructive testing, industrial metrology and modern systems of quality systems (CETIME Tunisia)
• Method of protection against corrosion (TIC).
• Inspection and verification of pressure vessel (TIC)
• Radiographic examination level II ( CETIME- TUNISIA)
• Welding inspector Level II (RINA)
• Welding Procedure Specification
• Procedure Qualification Record
• Welding Procedure Qualification
• NDT Inspector LEVEL II (RINA)
SKILLS
• Piping inspection
• mechanical inspection
• Steel fabrication quality control
• Pressure vessel inspection
• In factory reception
• Welding inspection
• Painting and coating inspection
• Storage tank Construction supervision
• Pipeline hydrotest
• Radiographic examination
• NDE request
• Steel structure fabrication and site erection.
• Corrosion and intégrity
EXPERIENCE
AUGUST 2006
Technique inspection et contrôle, inspection agency
• BGT British Gas Tunisian BranchHasdrubal project
Construction of Gas station Hasdrubal plant:
– Data project : 5 million Nm3/hour Natural Gas station
– Position : piping inspector :
• Testing of 120 km of pipeline during manufacturing (NDT , destructive testing, hydro test)
• Inspection of PEHD and concrete coating of 80 km pipeline API 5L : holiday test, salt test….
• SHELL Company Ltd : Repair of 07 Tanks Storage 10 000 m3 :
– Position: Welding and Painting Inspector.
– ITP verification and Approval
– Standard : API 650 and API 653
– ITP verification and Approval
– Material Verification (Plates,Nozels,Valves,Flanges…)
– WPS and PQR Approval.
– Dimensional Check
– Consumable Check (Electrodes,Wires)
– Welding activities Monitoring
– NDT request
– Hydrotest .
– Painting Inspection ( thikness, dew point,…….)
• SAIPEM : HASDRUBAL project off shore 106km pipeline :
– Data project: 106 km 18” pipeline
– Position: QC welding and coating inspector
– WPS and PQR Approval.
– Pipe Fitter inspection
– Dimensional Check
– Consumable Check (Electrodes,Wires)
– Visual inspection
– Coating inspection (grit blasting check, hest shrink sleeves application check…….).
• SOMECO/PIONEER Company : QA/QC Engineer for Construction of the CPF Oil Station Jinen OilField (South Of Tunisia) :
– Data Project : 100 000 inch (Carbon Steel ,SS&Duplex)
– Standard: B31.3 , ASME IX; ASME V……….
– Welding activities Inspection
– Welding Book
– NDT request
– Punch List
– Hydrotest.
– Painting Inspection
• SOCOMENIN:
– TIFERT PROJECT
– Qality control inspector for steel structure fabrication.
– Visual Inspection.
– Dimensionnel check
– Fabrication drawngs verification.
• BOUCHAMAOUI INDUSTRIES : Gas pipeline Gabes – Zarzis – Djerba:
– Valves reception according API D : VALVITALIA – ITALY
– Gas filters reception : Technoforge – Italy
– Traps Reception : Technoforge – Italy
Gas Pipelines official hydrotests.
• PIONEER : El WAHA oil field:
– QA/QC engineer
– Visual inspection of weld
– Non destructif test monitoring
– Radiographic films reception
– Painting and coating inspection
TAV Construction : Construction of International airport of Enfidha– TUNISIA
– Position: QA/QC Inspector.
– Data Project : 7000 ton of steel structure & 12 km of piping fuel hydrant system ( kerosene)
– Material Verification (plates, piping, fittings, valves…)
– WPS and PQR Approval.
– Dimensional Check
– Consumable Check (Electrodes,Wires..)
– Welding visual inspection.
– NDT request
– Hydro test.
– Painting inspection ( thickness , dew point, humidity , …)
BRIGA PETROLEUM MARKETING – LIBYA
– Gas tank inspection ; 44000 L
– 150000 inch piping
– Two steam turbine
– Hydrotest
– Pneumatic test
– Wall thickness measurement and corrosion evaluation
– Radiographic examination
– Safety valves calibration
– General inspection and accessories check
– Inspection reports and certificates preparation.
– Piping inspection
– Checking of materials to be used prior to fabrication
– Inspection of Site Welding activities.
– NDT request.
– Test package monitoring
– Sand blasting and painting inspection.
– Storage tanks inspection monitoring.
DUBAI ALUMINIUM
Extension of the ALCOA Unit Project– DUBAI
– WPS approval
– Welding procedure qualification.
– Welder’s qualification
GHANNOUCH 1 x 400 MW combined cycle power station construction project– TUNISIA
– Position : QA/QC Inspector
– Data Project : 400 MW power Plant
• 08 Tank Storage API 650
• Osmosis Reverse Unit
• Combined Cycle Turbine 400MW
• 60 000 inch Piping Process ASME B31-3
• 1400 Tonnes Steel Structures.
– Painting inspection
– Welding inspection
– Checking of materials to be used prior to fabrication
– Inspection of Site Welding activities.
– Visual welding inspection
– NDT request.
Role & Responsibility as QA/QC Inspector
Monitor the daily construction activities, perform daily site-inspections, and Ensure compliance with the QA/QC program, project drawings and Project specifications.
QA/QC inspection ensures the compliance of construction & associated activities related to client approved drawing specification by inspection & witnessing & monitoring the activities.
Ensuring implementation of Quality Control plan, procedure and inspection & test plan
Familiar in ASME, API, ASTM, standard/ procedures, and Co-ordinate with client for QA/QC activities.
Performing inspection as per ITP
Review of Hydro test packages, Line checking and Punch listing
Coordinate with construction, testing group and QC department in the preparation of test requirement of test pack and facilitate close out of any outstanding punch items before hydro test.
Inspection of Pressure test (hydro, pneumatic) according to piping class, their test limit and required pressure along with PID.
Involved in Reinstatement activities/clear the B punch item.
Responsible for implementation of internal QA/QC programs, including Quality Improvement processes, quality management systems, inspection test planning procedures, receiving inspection plans, Quality Procedure Guidelines.
COMPUTER SKILLS
– Office automation softwares: Microsoft Excel, Microsoft PowerPoint, Microsoft Word…
– Operating systems: Windows 98; Windows 2000; Windows Xp
– Scientific Software: Autocad, SolidWorks, Catia V5
LANGUAGES
– Arabic: Mother Tongue
– Frensh: Fluency
– English: Fluency