ACADEMIC
DME (Diploma in Mechanical Engineering)
DCM (Diploma in Co-Operative Management-Accounts)
Ms Office (Excel, Word, PowerPoint, etc)
Technical Qualification:
CSWIP 3.1(Ref ; 1SWD/653985)
ASNT LEVEL-II – Penetrate Test
ASNT LEVEL-II – Magnetic Particle testing
ASNT LEVEL-II – Ultrasonic Test
ASNT LEVEL-II – Radiographic Test
Knowledge of
Reviewing of WPS, PQR.
Witnessing Welder Qualification Tests.
Inspection of Welding, Fit ups, and all Piping activities.
Coordinate NDE activities and reviewing reports.
Test Package Preparation and Review
Preparation of Punch Lists during line walk down
Witnessing Hydro tests, Pneumatic Tests
Re instatement and Pre Commissioning Activities
Final Mechanical Walk down with Company Representatives
Final dossier preparation and submission
GULF – Project Handled:
BASRAH GAS COMPANY Since NOV 2013 to NOV 2014
(SHELL)
SAIPEM – IRAQ QA/ QC Piping & Welding inspector
BARZAN ONSHORE PROJECT Since OCT 2012 to OCT 2013
(RASGAS – JGC)
QATAR QA/ QC Piping & Welding inspector
KHARAFI NATIOANL. Since JAN 2012 to SEP 2012
(HABSHAN 5 PROJECT)
ABUDHABI – UAE. QA/ QC Piping & Welding inspector
NASSER’S AL- HAJRI CORPORATION. Since July 2007 TO oct 2011
Jubail, Kingdom of Saudi Arabia. QA/ QC Piping & Welding inspector
PROJECT : Jubail Acetyls Complex (Sipchem – JAC- Vinyl Acetate Monomer)
CLIENT : FLUOR
PERIOD : July 16th 2007 to May 28th 2009
POSITION : QA/QC Piping Inspector
PROJECT : Saudi kayan Petrochemical Project(SKOP).
CLIENT : Kellogg Brown & Root (KBR)
PERIOD : Feb2009 to March 2010
POSITION : QA/QC Piping & welding Inspector
PROJECT : National Cheveron Philips (NCP).
CLIENT : Japan Gasoline Co. (JGC).
PERIOD : Oct 2009 to Nov 2010
POSITION : – QA/QC Piping & welding Inspector
PROJECT : Saudi Aramco Total Oil Refinery Project (SATORP)
CLIENT : TECHNIP
PERIOD : Jan 2011 to oct 2011
POSITION : QA/QC Piping Inspector
INDIA EXPERIENCE
VEESONS ENERGY SYSTEMS PVT LTD. APR 2004 To MAR 2007
THIRUCHIRAPPALLI – INDIA QA/ QC Piping & Welding inspector
DUTIES AND RESPONSIBILITIES:
Related to QA /QC Welding & Piping
Preparation, Review & approval of Inspection & Test Plan (ITP) Quality Requirements.
Fit-Up & Visual Inspection of Weld and Joint
Monitoring of Post Weld Heat Treatment (P.W.H.T)
Preparing the as built for Final Modification according to Site Conditions.
Final Clearance for Hydro Test Packages.
Witnessing Hydro tests, Pneumatic test’s Through Client.
Preparation of Final Documents for System Handover to Commissioning Team .
Preparation of inspection reports submit the client.
Piping Line Installation inspection with reference to Isometric Drawings & P&ID
To Inspect the Fit-Up, Weld visuals, Dimensional & Planarity, Equipment Alignment
Inspection of Pipes, Isolation Valves & Pipe Fitting’s for Visual, Dimensional,
Conduct WQT(welder qualification test) as per Welding Procedure Specification (WPS).
To monitor welders to ensure all welding works are carried out as per Approved WPS and Requirements.
Inspection of Structural Material’s, Pipe Fitting’s for Visual, Dimensional, Mechanical & Chemical properties.
Updating of the Isometric Drawings in according to Services and Site Conditions.
Line checking and preparation of punch lists
Pressure gauges & Pressure safety valve (PSV) during Hydro test & reviewing calibration certificates of the same.
Witness testing activities
Reinstatement activities
Conduct reinstatement of piping after pressure test, monitor internal cleaning by air blowing, fitting up of new appropriate gaskets, bolts and nuts tightness
RELATED TO WELDING INSPECTOR :
Inspection of the Pre Heating, Inter pass Temperature and Post Weld heat Treatment.
Inspection of Non-Destructing Testing in Weldments such as Radiographic Testing, Ultrasonic testing, Magnetic particle testing and Dye penetrate Testing.
Reviewing the Radiography films & Reports and Coordinating for the repair Welds.
Checking the Essential Parameters as per the W.P.S Requirements and Quality Procedures.
Visual and Gauge inspection in fit-up’s before and after welding
To check the proper electrodes are used for the respective materials and the temperature has been maintained as per the electrode manual.
Handled welding process like GTAW, SMAW & SAW as per international codes and standards such as ASME V, ASME IX , ASME B31.3, 31.1
To arrange NDE inspection as required by project procedure after the completion of Weld Visual.
Monitoring of preheating & PWHT procedures.
Witness & documentation of non destructive testing’s (RT,PT,UT&MT).
Radiographic film interpretation & evaluation.