ACADEMIC RECORD:
1) HIGH SCHOOL DIPLOMA : Razi High school ( Tehran/Iran) 1985
2) BACHELOR OF SCIENCE – Civil and Structural Engineering : Azad University – Central Branch – Tehran/Iran – 1992 to 1997
TRAINING COURSES:
1) Frameworks Environment (Plant Design System) : Linde AG (Munich/Germany) 2001
2) Equipment Modeling (Plant Design System) : Linde AG (Munich/Germany) 2001
3) Drawing Manager (Plant Design System) : Linde AG (Munich/Germany) 2001
4) MicroStation : Linde AG (Munich/Germany) 2001
SKILLS & EXPERTISE :
• STAAD.Pro
• SAP
• MS OFFICE
• MATHCAD
• STEEL DESING
• CONCRETE DESIGN
• FOUNDATION DESIGN
• EQUIPMENT FOUNDATION DESIGN
• PDS (FRAMEWORKS ENVIRONMENT)
• MICROSTATION
• AUTOCAD
PROFESSIONAL EXPERIENCE
(15 Years Experience in Oil – Gas and Petrochemical Industries):
June of 2006 to Present – PETROFAC INTERNATIONAL LIMITED (SHARJAH / UAE)
1) Laggan – Tormore Field Development Project (JI-2005) / Shetland Ilands on the UK
Continental Shelf – Shetland Gas Plant (November of 2011 to Present)
• Client : Total E&P UK Ltd
• Structural Analysis and design for Preassembled Steel Structures Including of:
– Inplace Analysis
– Lifting Analysis
– Road Transportation Analysis
– Sea Transportation Analysis
– Preparation of Sample Calculation notes
– Weight Control Report
2) Gas Sweetening Facilities Project (JI-2001) / Qatar (September of 2010 to November 2011)
• Client : Qatar Petroleum
• Responsible for Analysis and design of Static Equipment Foundation
3) Asab Full Field Development Project (JI-193) / Abu Dhabi (March of 2009 to Sep. of 2010)
• Client : ADCO
• Analysis and design of Pipe Rack
• Analysis and design of Pipe Rack Foundations
4) In Salah Gas Compression Project (JI-189) / Algeria (November of 2007 to March of 2009)
• Client : In Salah Gas
• Analysis and design of Blast Resisting Steel Structures
• Analysis and design of Steel Structures
• Analysis and design of Pipe Rack Foundations
• Analysis and design of Static Equipment Foundations
5) Proposal: KOC-New Booster Station BS-160 (PI-7004) / KUWAIT
(April of 2007 to November of 2007)
• Client : Kuwait Oil Company
• Responsible for Preparation of Bid Proposal – Assistant of Lead Engineer
6) Proposal: Brass LNG Project(PI-6018) / Nigeria (November of 2006 to April of 2007)
• Client : Brass LNG Limited
• Volume : 10 million tons per annum (MTPA) of LNG
• Responsible for Preparation of Bid Proposal – Lead Engineer
7) Azar Field Development Feed(PI-81867) / Iran (December of 2006 to February of 2007)
• Client : Hydro Zagros Oil & Gas
• Responsible for Preparation of Drainage Calculation and
Earth Work Volume Calculation– Assistant of Lead Engineer
8) Soroosh And Nowrooz Offshore Integrated Development (JI-709) /Iran
(September of 2006 till November)
• Client : Shell
• Responsible for preparation of Steel Structural Secondary Supports – Assistant of Lead Engineer
9) Proposal: Zarzaitine Oil Field (PI-6016) / Algeria (June till September of 2006)
• Client : Sinopec-Sonatrach
• Preparation of Bid Proposal – Assistant of Lead Engineer.
1996 – 2006 NARGAN CONSULTING ENGINEERS Co. (TEHRAN / IRAN)
10) Low Density Polyethylene Plant – 9th Olefin Complex- Asaluye / Iran
(Sep. of 2003 till June 2006)
• Client : NIPC (National Iranian Petrochemical Company)
• Joint venture with Technip- Lyon/France
• Responsible for 3D modeling of the Plant (3 months Technip/France).
• Responsible for modeling of all civil elements and civil works with PDS.
• Preparation of civil drawings
• Assistant of Civil & Structural Group Lead Engineer.
11) C2+ Recovery Plant- Marun / Iran (Apr. 2001 to Sep. 2003)
• Client : NIPC (National Iranian Petrochemical Company)
• Joint venture with Linde AG- Munich/Germany
• Lead Structural Engineer of the Task Force Project (6 months Linde/Germany).
• Responsible for modeling of all structural elements and civil works with PDS.
• Responsible for preparation of loading drawings and structural drawings.
12) South Pars Phase I Gas Refinery Utility And Offsite Facilities- Asaluye / Iran
(2000 to 2001)
• Client : NIPC (National Iranian Petrochemical Company)
• Analysis and design of blast proof concrete structures with SAP 2000.
13) Melamine Petrochemical Plant- Bojnord / Iran (1999 to 2000)
• Client : NIPC (National Iranian Petrochemical Company)
• Analysis and design of steel and concrete structures with SAP 2000.
• Design of equipment foundation.
14) Paraxylene Production Plant- Bandar Emam / Iran (1998 to 1999)
• Client : NIPC (National Iranian Petrochemical Company)
• Responsible for preparation and checking of the shop drawings in Paysaz Co. Ahwaz / Iran
15) Tabriz Polypropylene Plant- Tabriz / Iran (1997 to 1998)
• Client : NIPC (National Iranian Petrochemical Company)
• Responsible for preparation and checking of the shop drawings in
Tehran Industries Co.- Karaj / Iran
16) Esfordi Phosphate Plant- Yazd / Iran (1996 to 1997)
• Client : NIPC (National Iranian Petrochemical Company)
• Responsible for checking of the shop drawings
1994 – 1996 GOZARRAH CONSULTING ENGINEERS Co.(TEHRAN / IRAN)
17) Niayesh high way, Kordestan high way and Park way Bridge- Tehran / Iran
• Cilent : Tehran Municipality
• Cooperation in road and traffic design.
• Student of Civil & Structural Engineering