Trinidad based QA and QC Manager

Available
Serial No: 15732
Skills keywords: 
Current location:  Tunapuna/Piarco Regional Corporation, Trinidad and Tobago - View on map
Nationality: Trinidadian
Spoken languages: english

Education/Qualifications

Currently Pursuing: PMP (Project Management Professional) Certification

April 2014: Ultrasonic Testing Levels 1 & 2.

March 2014: OPITO FOET (Further Offshore Emergency Training)

March 2014: Magnetic Particle Testing Levels 1 & 2.

March 2014: Liquid Penetrant Testing Levels 1 & 2.

March 2014: Ultrasonic Digital Thickness Level 2 Limited.

December 2013: Certified Quality Auditor (CQA) American Society for Quality (ASQ)

October 2013: Certified Manager of Quality/Organizational Excellence (CQM/OE) American Society for Quality (ASQ)

December 2012: NACE Certified Coating Inspector – Level 3 – Peer Review

June 2012: NACE Offshore Corrosion Assessment Training (OCAT)

November 2011: Primavera Enterprise Project Portfolio Management

March 2010: TBOISET (Tropical Basic Offshore Safety Induction and Emergency Training)

HUET (Helicopter Underwater Escape Training)

October 2009: Certified Radiographic Film Interpreter in accordance with ASNT RP-SNT-TC-1A (2006) and CP 105 (2006)

JULY 2009: Training and Certification in Butt Fusion and Electro fusion of HDPE Pipe

JULY 2008: Microsoft Projects 2007

AUG. 2008: Project + (Project Management)

JUNE 2008: API 570 Certified (Piping Inspector)

JULY 2007: NACE CIP Level 2

MAY 2007: NACE CIP Level 1

JUNE 2005: CWI Certified Welding Inspector (AWS)

JULY 1997: Dale Carnegie (Effective Speaking)

1990-1995: Presentation College SanFernando (Trinidad)

 

Career Summary

April 2014 – Present
Position: Client Representative
Company: Repsol

Dec. 2012 – Jan. 2014
Position: Client Representative for SNC Lavalin & PDVSA (Petroleos de Venezuela, S.A.)

Project: Dragon Cigma Project
Cost: $1.5 Billion (USD)

Key Responsibilities:
Planning and monitoring the day-to- day operations for the project

Auditing the daily activities of the contractor

Team-Lead for all inspectors on the project

Auditing of documentation for the project

Involved in the strategic planning for the project

Oct. 2011 – Nov. 2012
Position: Client Representative/Project Supervisor/QAQC Supervisor for EOGR (ENRON) for the fabrication maintenance works on the Kiskadee Platform offshore Trinidad and Tobago

Key Responsibilities:
Planning and monitoring the day-to- day operations for the project

Auditing the daily activities of the contractor

Team-Lead for all inspectors on the project

Auditing of documentation for the project

Involved in the strategic planning for the project

Aug. 2010 – Sept. 2011:
Position: Client Representative/Inspector / Lead Auditor for The National Gas Company of Trinidad and Tobago (NGCTT)
Project: NEO Pipeline Project
Cost: $550 Million (USD)

Key Responsibilities:
Responsible for the verification, reply and issuance of all RFIs, NCRs and Change Orders (Positive & Negative)

Responsible for tracking of Contractor’s progress and verifying Contractor’s Progress Percentage from invoices submitted to the Client

Planning and monitoring the day-to- day operations for the project

Auditing the daily activities of the contractor

Team-Lead for all inspectors on the project

Auditing of documentation for the project

Conduct weekly/monthly Audits for the project

Involved in the strategic planning for the project

June – July 2010
Position: Consultant for Trinweld Contracting Services Limited
Project: PPVS Upgrade Point Lisas
Cost: $448 Million (USD)

Key Responsibilities:
Responsible for the Implementation of a Quality Management System

Preparation and Qualification of Welding Procedure Specifications (WPSs), Qualification of welders, ITPs, Work procedures etc

Planning and monitoring the daily QA/QC activities for the project

Auditing the daily activities of the organization

Conduct weekly/monthly Internal Audits for the project

Involved in the strategic planning for the project

April – May 2010
Position: Client Representative/Inspector for BHP Billiton
Project: The Angustura Gas Project in Trinidad and Tobago
Cost: ($726M USD)

This Project included the installation of a jacket and topside of the new Gas Export Platform for the supply of Natural Gas to Onshore Trinidad via a 36’’ Pipeline and Natural Gas to Onshore Tobago via a 12’’ Pipeline

Key Responsibilities:
Involved in Planning and monitoring the daily operations for the project

Team-Lead for all inspectors on the project

Auditing of documentation for the project

Conduct weekly Audits for the project

July 2005 to April 2010
Position: QA/QC Manager at API Pipeline Construction Company Limited

Major Projects:

• BUD Pipeline Project (48” 36”,24” 30” 16”) ($11M USD)

• BGTT ECMA Dolphin Deep Development Onshore Pipeline Project- (24’’ 20” 4”) ($10M USD)

• CIPP 56” Natural Gas Pipeline ($277M USD)

• ConocoPhillips/PPGPL 8” gas pipeline ($5M USD)

• The NGC Onshore Tobago Campaign II ($30M USD)

• The Union Pipeline Project 24’’ 16’’ 8’’ 4’’ Natural Gas Mains ($5M USD)

• The fabrication, welding and hot tapping of 1-48’’x 48’’, 1-36’’x 36’’ and 1-30’’x24’’ split tee on existing live In-service natural gas pipelines for the national gas company of Trinidad and Tobago (NGCTT) ($5M USD)

• The fabrication, welding, coating and HDD (horizontal directional drilling) of 8000ft. Of a 10’’ gaseous nitrogen pipeline through the point lisas industrial estate

• Construction of the Tamana Service Main for NGC which comprised of the following: welding, coating HDD and hydro testing of 6’’ steel main and the butt fusion, electro fusion, HDD and hydro testing of 2’’, 4’’and 6’’ HDPE pipes

• The hot tapping of 1-48’’x 36’’ & 2-36’’x 24’’ reduced branch split tees on existing live in-service natural gas pipelines for T.D. Williamson and Black & Vaetch ($3M USD)

• Hydro testing of 63 km of 36’’bud pipeline from onshore to offshore facility for Con-Dive LLC

• Installation of numerous In-Service welded fittings

• Construction of numerous oil and water storage tanks for Petrotrin

Key Responsibilities:
Planning and monitoring the day-to- day operations of projects

Auditing the daily activities of sub-contractors

Auditing of documentation for projects

Involved in the strategic planning for projects

Preparation of all ITP’s, work procedures etc

Supervision of all junior inspectors/technicians

Radiographic Interpretation

Blue Print Reading

Welding Procedures / Welders Qualification

Welding Inspection

Coating Inspection

Preparation and review of documentation (Dossiers)

Hydro testing of Pipelines

Preparation of Procedures (Construction and welding)

Complying with ISO-9001:2000 requirements

Jan 2005 to June 2005
WELDFAB LTD.
Position: QA/QC Inspection Engineer

Major Projects:

• Atlas methanol plant

• Titan methanol plant

• M5000-methanol plant

• BGTT platform construction

Key Responsibilities:
Revision of Radiographs

Blue Print Reading

Testing of welders

Visual Inspection of Welds

Preparation of hand-over documentation

Hydro testing of Pipelines

Feb 2004 to Nov 2004
QUALITY PERFECTION SERVICES LTD
Position: General Supervisor

Key Responsibilities:
Involved in the planning and monitoring the day-to- day operations of the company

Involved in the strategic planning for the company

July 1995 to Feb 2004
K. R. DEE’S LTD
Position: Manager

Key Responsibilities:
Planning and monitoring the day-to- day operations of the company.

Involved in the strategic planning for the company

Projects:

• Construction of the BP Administration Building, Queens Park Savannah

• Maintenance works on Petrotrin offshore platforms

• Expansion and Renovation of the Gulf City Shopping Complex

• Tobago House of Assembly Administration Building

• Maintenance works for Halliburton at Galeota Point

• Maintenance works for Hydrotech at Galeota Point

• Maintenance works for Compression and Power on Eagle1

 

 

 

 

 

 

 